{
  "schemaVersion": "1.0.0",
  "title": "UK Assured Shorthold Tenancy (AST) repair-clause index",
  "jurisdiction": "England (Wales closely related; Scotland/NI differ)",
  "updated": "2026-11-04",
  "disclaimer": "General technical information, not legal advice on a particular tenancy. Gov Model clauses quote the published DLUHC/MHCLG Model Agreement. Other families use representative standard patterns — not verbatim paid-template copyright text. England private ASTs converted to assured periodic tenancies from 1 May 2026 under the Renters’ Rights Act 2025; repair and fitness duties continue to apply to the written agreement people still hold.",
  "coreDirective": "Contractual clauses attempting to transfer structural, exterior, or mechanical ventilation maintenance that falls under Landlord and Tenant Act 1985 s11 (or fitness under Homes (Fitness for Human Habitation) Act 2018 / s9A) to the tenant are void or unenforceable to that extent. Unfair terms may also fail under Consumer Rights Act 2015 s62.",
  "statutoryBaseline": [
    {
      "id": "lta-1985-s11",
      "label": "Landlord and Tenant Act 1985 s11",
      "summary": "Implied repairing covenant: structure/exterior; water/gas/electricity/sanitation installations; space heating and hot-water installations — once landlord on notice."
    },
    {
      "id": "fitness-habitation-2018",
      "label": "Homes (Fitness for Human Habitation) Act 2018 / LTA 1985 s9A",
      "summary": "Implied covenant that the dwelling is fit at grant and remains fit throughout, including serious damp and inadequate ventilation among s10 / HHSRS lenses."
    },
    {
      "id": "cra-2015-s62",
      "label": "Consumer Rights Act 2015 s62",
      "summary": "Unfair terms in consumer contracts are not binding on the consumer; a term requiring the tenant to repair the roof or maintain the boiler as if they were the landlord is typically unfair."
    },
    {
      "id": "hhsrs-housing-act-2004",
      "label": "Housing Act 2004 HHSRS",
      "summary": "Council hazard assessment (including damp and mould); Category 1 triggers appropriate enforcement action."
    }
  ],
  "templates": [
    {
      "id": "gov_model",
      "slug": "gov-model-ast",
      "name": "UK Government Model Agreement for an AST",
      "publisher": "DLUHC / MHCLG (GOV.UK)",
      "family": "gov_model",
      "prevalence": "Widely downloaded free model; often the baseline other platforms echo.",
      "sourceUrl": "https://www.gov.uk/assured-tenancy-agreements-a-guide-for-landlords",
      "textStatus": "gov_model_verbatim_or_close",
      "notes": "The standalone GOV.UK model AST publication page was withdrawn; current landlord guidance is the assured tenancy agreements guide linked above. Section C covers tenant obligations and Section D landlord obligations in historic model AST editions. Clause numbering uses C4 (tenant care) and D3 (landlord repair) in those editions. Some informal citations say ‘C3’ for repairing themes — map carefully to the edition you hold.",
      "repairClauses": [
        {
          "clause_identifier": "Gov Model Section D3.1 — Landlord repairing obligations (LTA 1985 s11)",
          "theme": "landlord_structure_installations",
          "contract_text": "In accordance with section 11 of the Landlord and Tenant Act 1985 (repairing obligations in short leases) the Landlord shall: (a) keep in repair the structure and exterior of the Property (including drains, external pipes, gutters and external windows); (b) keep in repair and proper working order the installations in the Property for the supply of water, gas and electricity and for sanitation (including basins, sinks, baths and sanitary conveniences, but not other fixtures, fittings and appliances for making use of the supply of water, gas or electricity); and (c) keep in repair and proper working order the installations in the Property for space heating and heating water.",
          "plain_english": "The landlord must repair the building shell and the main service installations — walls, roof, windows, drains, gutters, wiring, pipes, sinks, baths, toilets, boiler and radiators — once they know about the problem. This restates statute; the contract cannot shrink it.",
          "landlord_duty": "Repair structure/exterior and keep listed supply, sanitation, and heating installations in repair and working order within a reasonable time after notice or awareness.",
          "tenant_duty": "Notify the landlord promptly (see C4.3); allow reasonable access for repairs; do not treat s11 items as tenant DIY.",
          "statutory_override": "LTA 1985 s11 (cannot be contracted out); Homes (Fitness for Human Habitation) Act 2018 / s9A; CRA 2015 s62 if any attempt is made to shift these duties.",
          "action_step": "Tenant: send dated written notice with photos. Landlord: acknowledge, inspect, repair underlying cause — not mould wipe alone for damp."
        },
        {
          "clause_identifier": "Gov Model Section C4.1 — Tenant duty to take reasonable care (tenant-like user)",
          "theme": "tenant_like_user",
          "contract_text": "The Tenant must take reasonable care of the Property, any items listed in the inventory and the Common Parts (if any). This includes (but is not limited to): (a) taking reasonable steps to keep the Property adequately ventilated and heated so as to prevent damage from condensation; (b) taking reasonable steps to prevent frost damage occurring to any pipes or other installations in the Property, provided the pipes and other installations were adequately insulated at the start of the Tenancy; and (c) disposing of all rubbish in an appropriate manner and at the appropriate time.",
          "plain_english": "The tenant must behave in a tenant-like manner: use extracts and heating sensibly, keep vents usable, avoid freezing pipes where insulation was adequate at start, and put rubbish out properly. This is ordinary care — not a transfer of the landlord’s structural repair duty.",
          "landlord_duty": "Provide working extract/heating installations that fall under s11; do not use ‘ventilation’ wording to avoid fixing sealed air bricks, packed eaves, or failed fans.",
          "tenant_duty": "Use extractors, keep trickle vents open, report leaks early, heat reasonably in cold weather, and avoid negligent damage.",
          "statutory_override": "Does not displace LTA 1985 s11 or fitness/s9A. Lifestyle letters cannot override Category 1 damp hazards or unfit dwellings. CRA 2015 s62 if care clauses are stretched into structural repair.",
          "action_step": "Photograph extracts and vents; run free loft/subfloor triage if mould appears; report fabric defects in writing while continuing ordinary ventilation."
        },
        {
          "clause_identifier": "Gov Model Section C4.3 — Tenant duty to notify repairs",
          "theme": "notice_and_report",
          "contract_text": "The Tenant must notify the Landlord as soon as reasonably possible about any repairs that are needed to the Property or to any items listed on the inventory for which the Landlord is responsible (see clause D3).",
          "plain_english": "Tell the landlord quickly, in writing if you can, when something they must repair goes wrong. Delay can slow the s11 clock that usually starts on notice.",
          "landlord_duty": "Provide a clear reporting channel; act once on notice or when they ought to know.",
          "tenant_duty": "Give prompt written notice with enough detail (room, date, photos) for the landlord to act.",
          "statutory_override": "s11 notice rules; fitness claims may still engage on condition. Do not invent rent-withholding strategies from this clause alone.",
          "action_step": "Email/portal: address, rooms, dates first seen, photos, clear ask to inspect/repair."
        },
        {
          "clause_identifier": "Gov Model Section D3.3 — Inventory appliances",
          "theme": "inventory_appliances",
          "contract_text": "The Landlord must keep in repair and proper working order any furniture, fixtures, fittings and appliances which are listed in the inventory, except where the damage or need for repair is a result of the Tenant’s failure to comply with the obligations in clause C4.1.",
          "plain_english": "If the inventory lists a fridge, cooker, or washing machine supplied with the let, the landlord keeps it working unless the tenant broke it by misuse.",
          "landlord_duty": "Repair or replace listed supplied appliances (subject to tenant misuse exception).",
          "tenant_duty": "Use appliances as intended; report faults; do not claim landlord repair for tenant-caused damage.",
          "statutory_override": "Contractual inventory duty sits alongside s11 for installations; unfair shifts of boiler/heating repair fail under s11 / CRA s62.",
          "action_step": "Check the inventory PDF; report listed appliance faults in writing with model/serial if known."
        },
        {
          "clause_identifier": "Gov Model guidance — Fitness for human habitation (paired with D3)",
          "theme": "fitness",
          "contract_text": "A landlord must ensure that the property they let is fit for human habitation according to the terms of the Homes (Fitness for Human Habitation) Act 2018 at the outset and throughout the tenancy.",
          "plain_english": "Beyond repair lists, the home must stay fit to live in — serious damp, dangerous electrics, or failed heating can make it unfit even when parties argue about lifestyle.",
          "landlord_duty": "Keep the dwelling fit throughout; investigate and remediate serious damp/mould causes.",
          "tenant_duty": "Report unfitness risks promptly; allow access; continue tenant-like use.",
          "statutory_override": "Homes (Fitness for Human Habitation) Act 2018 / LTA 1985 s9A; HHSRS / Housing Act 2004.",
          "action_step": "Open /tenancy/england-statutory-habitability-baseline and /tenancy/damp-mould-without-blame; keep a dated evidence file."
        }
      ]
    },
    {
      "id": "nrla_standard",
      "slug": "nrla-standard-ast",
      "name": "National Residential Landlords Association (NRLA) Standard AST",
      "publisher": "NRLA (member template family)",
      "family": "nrla_standard",
      "prevalence": "Very common among landlord-association members across England.",
      "sourceUrl": "https://www.nrla.org.uk/",
      "textStatus": "representative_pattern",
      "notes": "Exact clause numbers vary by NRLA edition and year. Patterns below reflect typical NRLA-style repairing and tenant-like-user wording — verify against the PDF you hold.",
      "repairClauses": [
        {
          "clause_identifier": "NRLA-pattern — Landlord repairing covenant (s11 mirror)",
          "theme": "landlord_structure_installations",
          "contract_text": "Representative pattern: The Landlord shall keep in repair the structure and exterior of the Property and keep in repair and proper working order the installations for the supply of water, gas and electricity, for sanitation, and for space heating and heating water, in accordance with section 11 of the Landlord and Tenant Act 1985.",
          "plain_english": "Same core as the Gov Model: landlord repairs the shell and core services. Association branding does not change s11.",
          "landlord_duty": "Honour s11 repairs within a reasonable time after notice.",
          "tenant_duty": "Notify defects; allow access; do not accept a clause that makes the tenant repair the roof or boiler.",
          "statutory_override": "LTA 1985 s11; Fitness 2018 / s9A; CRA 2015 s62.",
          "action_step": "Highlight the repairing clause in your PDF; compare word-for-word with s11 duties on /tenancy/england-statutory-habitability-baseline."
        },
        {
          "clause_identifier": "NRLA-pattern — Tenant to use in tenant-like manner / prevent condensation",
          "theme": "tenant_like_user",
          "contract_text": "Representative pattern: The Tenant shall use the Property in a tenant-like manner, keep it reasonably clean, and take reasonable steps to heat and ventilate so as not to cause condensation damage, and shall not block vents.",
          "plain_english": "Keep the place clean, use heat and airflow sensibly, leave vents open. Condensation-prevention wording is about ordinary use — it does not license the landlord to ignore sealed air bricks or broken extracts.",
          "landlord_duty": "Maintain heating and mechanical ventilation installations; restore designed building airflow after works.",
          "tenant_duty": "Use extracts, keep trickle vents clear, wipe excess moisture, report persistent mould with photos.",
          "statutory_override": "Cannot override s11/fitness; GOV.UK damp guidance expects underlying causes fixed.",
          "action_step": "If mould persists with extracts used, escalate as fabric/airflow defect — /tenancy/damp-mould-without-blame."
        },
        {
          "clause_identifier": "NRLA-pattern — Report disrepair / allow access",
          "theme": "notice_and_report",
          "contract_text": "Representative pattern: The Tenant shall report any want of repair to the Landlord or Agent promptly and shall permit entry at reasonable times on reasonable notice for inspection and repair (except emergencies).",
          "plain_english": "Report problems quickly and let authorised people in to fix them, with notice except in emergencies.",
          "landlord_duty": "Give proper notice for access; complete repairs; respect quiet enjoyment.",
          "tenant_duty": "Report in writing; propose access windows; do not unreasonably refuse entry for s11 works.",
          "statutory_override": "Quiet enjoyment and harassment rules still apply; access clauses cannot authorise unannounced visits as a habit.",
          "action_step": "Keep a log of report dates and access offers."
        },
        {
          "clause_identifier": "NRLA-pattern — Tenant not to carry out structural alterations",
          "theme": "alterations",
          "contract_text": "Representative pattern: The Tenant shall not make structural alterations or additions, or alter plumbing/electrical installations, without prior written consent.",
          "plain_english": "Do not move walls, rewire, or replumb without written permission. Minor picture hooks are usually different from structural work.",
          "landlord_duty": "Consider consent requests reasonably where the agreement requires it; keep installations safe under s11.",
          "tenant_duty": "Ask before altering fabric or services; restore if required at end of tenancy.",
          "statutory_override": "Does not let the landlord dump s11 repair onto the tenant as a ‘DIY alteration’ obligation.",
          "action_step": "Get consent in writing before any works; never ‘fix’ a boiler yourself under a vague clause."
        }
      ]
    },
    {
      "id": "openrent_standard",
      "slug": "openrent-standard-ast",
      "name": "OpenRent Platform Standard AST",
      "publisher": "OpenRent (platform template family)",
      "family": "openrent_standard",
      "prevalence": "Very common for direct landlord–tenant digital signings in England.",
      "sourceUrl": "https://www.openrent.co.uk/",
      "textStatus": "representative_pattern",
      "notes": "OpenRent editions evolve. Patterns emphasise online reporting, inventory apps, and condensation/ventilation tenant duties typical of platform ASTs.",
      "repairClauses": [
        {
          "clause_identifier": "OpenRent-pattern — Landlord repair / statutory compliance",
          "theme": "landlord_structure_installations",
          "contract_text": "Representative pattern: The Landlord will keep the Property in repair and comply with section 11 of the Landlord and Tenant Act 1985 and with applicable fitness and safety duties, including gas and electrical safety obligations.",
          "plain_english": "Platform contracts usually say the landlord meets s11 and safety laws. Digital branding does not reduce those duties.",
          "landlord_duty": "Structure/installations repair; gas/EICR/smoke/CO duties as applicable; fitness throughout.",
          "tenant_duty": "Use the platform reporting channel; keep evidence downloads.",
          "statutory_override": "LTA 1985 s11; Fitness 2018; CRA 2015 s62.",
          "action_step": "Use in-platform repair tickets plus email backup so notice is dated."
        },
        {
          "clause_identifier": "OpenRent-pattern — Tenant condensation / ventilation care",
          "theme": "tenant_like_user",
          "contract_text": "Representative pattern: The Tenant must keep the Property adequately ventilated and heated, use extractor fans where provided, open trickle vents, and avoid drying clothes so as to cause mould, and must wipe condensation from windows.",
          "plain_english": "Use the fans and vents you have; do not ignore basic moisture control. If fans are missing or broken, that is usually a landlord installation issue under s11 — not proof you ‘caused’ all mould.",
          "landlord_duty": "Provide working extract where required; repair failed fans/heaters; investigate persistent mould causes.",
          "tenant_duty": "Run extracts, open trickle vents, report non-working fans, document lifestyle steps taken.",
          "statutory_override": "Cannot displace fitness/s11; sealed building airflow remains a fabric question — /tenancy/well-meant-works-that-trap-moisture.",
          "action_step": "Video a non-working extract; report it as an installation repair, not a confession of lifestyle guilt."
        },
        {
          "clause_identifier": "OpenRent-pattern — Inventory and end-of-tenancy cleaning",
          "theme": "inventory_appliances",
          "contract_text": "Representative pattern: The Tenant must return the Property and Contents in the condition shown on the check-in inventory, fair wear and tear excepted, and must pay for damage beyond fair wear and tear.",
          "plain_english": "Leave the place as found, allowing normal ageing. Fair wear and tear is not ‘damage’ you pay for.",
          "landlord_duty": "Supply an accurate inventory; distinguish wear from misuse; keep appliances listed in working order during the tenancy.",
          "tenant_duty": "Photograph on move-in/out; clean reasonably; challenge unfair wear deductions with evidence.",
          "statutory_override": "Deposit scheme rules; CRA unfairness; s11 still covers mid-tenancy repairs to installations.",
          "action_step": "Download inventory day one; photograph every room."
        },
        {
          "clause_identifier": "OpenRent-pattern — Report repairs via platform",
          "theme": "notice_and_report",
          "contract_text": "Representative pattern: The Tenant shall notify the Landlord of any disrepair through the designated messaging or repairs function as soon as reasonably practicable.",
          "plain_english": "Use the app/portal — and keep a copy. Platform notice still counts as notice for s11.",
          "landlord_duty": "Monitor the channel; respond; do not ignore tickets.",
          "tenant_duty": "Report early with photos; follow up if silent.",
          "statutory_override": "Notice can also be given by other durable written means if the portal fails.",
          "action_step": "Export or screenshot the repair thread."
        }
      ]
    },
    {
      "id": "propertymark_arla",
      "slug": "propertymark-arla-ast",
      "name": "Propertymark / ARLA Letting Agent Agreement",
      "publisher": "Propertymark (ARLA Propertymark) agent template family",
      "family": "propertymark_arla",
      "prevalence": "Dominant where a high-street or corporate letting agent manages the AST.",
      "sourceUrl": "https://www.propertymark.co.uk/",
      "textStatus": "representative_pattern",
      "notes": "Agent packs often insert the agent as notice address. Repair duties still sit with the landlord under statute even when the agent is the reporting inbox.",
      "repairClauses": [
        {
          "clause_identifier": "ARLA/Propertymark-pattern — Landlord repair via agent notice",
          "theme": "landlord_structure_installations",
          "contract_text": "Representative pattern: The Landlord covenants to repair the structure and exterior and to keep installations for water, gas, electricity, sanitation and heating in repair and working order. Notice of disrepair may be served on the Agent at the address given.",
          "plain_english": "Same s11 core; you often tell the agent. The agent is the mailbox — the landlord remains the duty-holder.",
          "landlord_duty": "Ensure the agent has authority and funds to instruct repairs; s11 still bites the landlord.",
          "tenant_duty": "Serve notice on the named agent/landlord address in the agreement.",
          "statutory_override": "LTA 1985 s11; Fitness 2018; agent terms cannot erase landlord duty.",
          "action_step": "Copy both agent and landlord email if both appear on the agreement."
        },
        {
          "clause_identifier": "ARLA/Propertymark-pattern — Tenant to keep clean and replace consumables",
          "theme": "tenant_like_user",
          "contract_text": "Representative pattern: The Tenant shall keep the interior clean and tidy, replace consumables such as light bulbs, fuses and smoke-alarm batteries where accessible, and shall not cause blockage to drains by improper use.",
          "plain_english": "Day-to-day cleanliness and simple consumables are usually on the tenant. Blocked drains from cooking fat can be on the tenant; collapsed drain stacks are not.",
          "landlord_duty": "Repair drains/gutters as exterior/structure under s11 when not tenant misuse.",
          "tenant_duty": "Clean; change accessible bulbs/batteries; avoid causing blockages; report structural drainage failures.",
          "statutory_override": "s11 still covers external pipes/gutters/drains; CRA s62 if ‘tenant repairs all drains’ is over-broad.",
          "action_step": "If a main drain fails without misuse evidence, report as landlord repair with photos."
        },
        {
          "clause_identifier": "ARLA/Propertymark-pattern — No unauthorised contractors",
          "theme": "alterations",
          "contract_text": "Representative pattern: The Tenant shall not instruct contractors or carry out repairs that are the Landlord’s responsibility without prior written consent, except in genuine emergency to limit damage.",
          "plain_english": "Do not hire a roofer on the landlord’s account without say-so — unless you must stop water pouring in tonight, then notify immediately.",
          "landlord_duty": "Respond to emergencies; reimburse reasonable emergency mitigation where appropriate.",
          "tenant_duty": "Call the emergency number; mitigate; follow up in writing.",
          "statutory_override": "Does not suspend s11 once notice is given; emergency mitigation is not a waiver of landlord duty.",
          "action_step": "In emergency: stop damage, photograph, notify agent same day in writing."
        },
        {
          "clause_identifier": "ARLA/Propertymark-pattern — Mechanical ventilation / extractor upkeep wording",
          "theme": "ventilation_installations",
          "contract_text": "Representative pattern: The Tenant shall keep extractor fans clean of dust and shall not disable or tape over fans or trickle vents; repair of the fan unit remains the Landlord’s responsibility unless damage is caused by the Tenant.",
          "plain_english": "Wipe the grille; do not tape vents shut. If the motor dies, that is usually a landlord installation repair under s11 — not a cleaning chore.",
          "landlord_duty": "Repair/replace failed extract fans and heating that are installations under s11.",
          "tenant_duty": "Clean accessible grilles; leave vents open; report dead fans.",
          "statutory_override": "Clauses transferring mechanical ventilation ‘maintenance’ of the unit itself to the tenant are vulnerable under s11 / CRA s62 / coreDirective.",
          "action_step": "Distinguish ‘clean the cover’ (tenant) from ‘replace the fan’ (landlord)."
        }
      ]
    },
    {
      "id": "generic_diy",
      "slug": "generic-diy-lawpack-ast",
      "name": "Generic Lawpack / High-Street Stationer Boilerplate AST",
      "publisher": "Various (Lawpack-style / stationer / free web templates)",
      "family": "generic_diy",
      "prevalence": "Common in older DIY lets and low-cost downloaded packs; highest rate of unfair or outdated repair wording.",
      "sourceUrl": null,
      "textStatus": "representative_pattern",
      "notes": "Treat with caution. Many packs pre-date Fitness 2018 or copy each other. Always test clauses against s11 / s9A / CRA s62.",
      "repairClauses": [
        {
          "clause_identifier": "DIY-pack-pattern — Over-broad ‘tenant keeps whole property in repair’",
          "theme": "unfair_shift",
          "contract_text": "Representative pattern: The Tenant shall keep the Property and all fixtures and fittings in good repair and condition throughout the tenancy and shall repair or replace anything that becomes defective.",
          "plain_english": "This tries to make the tenant the repairer of almost everything. For structure, exterior, and s11 installations it is not effective against statute.",
          "landlord_duty": "Still must meet s11 and fitness — this clause does not erase them.",
          "tenant_duty": "Still must act tenant-like and avoid negligent damage; do not accept the clause as proof you must fix the roof.",
          "statutory_override": "LTA 1985 s11 (cannot contract out); Fitness 2018 / s9A; Consumer Rights Act 2015 s62 unfair terms — coreDirective applies.",
          "action_step": "Flag the clause; cite s11; use /tools/ast-clause-matcher; seek regulated advice before court strategy."
        },
        {
          "clause_identifier": "DIY-pack-pattern — Tenant repairs windows/glazing/gutters",
          "theme": "unfair_shift",
          "contract_text": "Representative pattern: The Tenant shall repair all broken windows and keep gutters and downpipes clear and in repair at the Tenant’s expense.",
          "plain_english": "Broken glass caused by the tenant’s household may fairly sit with the tenant (Gov Model C4.5 style). Making the tenant repair gutters/exterior pipes as a blanket rule collides with s11 exterior repairing duties.",
          "landlord_duty": "Repair gutters, external pipes, and exterior windows under s11 except tenant-caused breakage allocations that are fair.",
          "tenant_duty": "Pay for glass they break; report gutter failure; do not climb roofs.",
          "statutory_override": "LTA 1985 s11(1)(a) structure and exterior including gutters and external pipes; CRA 2015 s62.",
          "action_step": "Separate ‘I broke the pane’ from ‘gutter leaked into the wall’ — second is landlord s11."
        },
        {
          "clause_identifier": "DIY-pack-pattern — Tenant maintains boiler / heating",
          "theme": "unfair_shift",
          "contract_text": "Representative pattern: The Tenant shall service and maintain the central heating boiler annually and keep the heating system in good working order.",
          "plain_english": "Boilers and space/water heating installations are classic s11 landlord duties. Annual landlord gas safety is a separate legal track. Pushing servicing onto the tenant is a red-flag unfair term.",
          "landlord_duty": "Keep heating installations in repair; arrange Gas Safety where required.",
          "tenant_duty": "Use heating properly; bleed radiators if taught/safe; report faults; do not DIY gas work.",
          "statutory_override": "LTA 1985 s11(1)(c); gas safety regulations; CRA 2015 s62; coreDirective on mechanical systems.",
          "action_step": "Refuse DIY gas work; report boiler failure as landlord repair immediately."
        },
        {
          "clause_identifier": "DIY-pack-pattern — Tenant-like care / report defects (valid core)",
          "theme": "tenant_like_user",
          "contract_text": "Representative pattern: The Tenant shall take reasonable care of the Property, keep it clean, and notify the Landlord of any defect or want of repair as soon as practicable.",
          "plain_english": "The valid heart of DIY packs: care for the place and speak up early. Keep this; distrust the over-broad repair shifts around it.",
          "landlord_duty": "Act on notice for s11/fitness items.",
          "tenant_duty": "Clean, care, notify.",
          "statutory_override": "Valid tenant-like duty coexists with mandatory landlord repairing covenant.",
          "action_step": "Keep the notice duty; strike through or legally disregard unfair structural-transfer lines with advice."
        }
      ]
    }
  ],
  "themeIndex": {
    "landlord_structure_installations": "Landlord repairs structure, exterior, and core service installations (s11).",
    "tenant_like_user": "Tenant ordinary care, cleanliness, ventilation/heating use, no negligent damage.",
    "notice_and_report": "How and when the tenant must notify disrepair.",
    "inventory_appliances": "Listed contents/appliances and end-of-tenancy condition.",
    "alterations": "Consent needed before altering fabric or services.",
    "ventilation_installations": "Cleaning grilles vs repairing fan/heating units.",
    "fitness": "Fitness for human habitation covenant.",
    "unfair_shift": "Clauses that try to move s11/fitness duties onto the tenant — treat as void/unenforceable to that extent."
  }
}
