Client PDF review
Sample packs from every premium tool
Each PDF is a fictional completed survey / pack with company branding. Operator how-to text is kept out of the PDF body — these are meant to read as finished client documents.
Back to field hub- Open PDF
Fire door inspection
Passed FD30S stair lobby door with gap photos and certification plug on file.
- Open PDF
Section 20 consultation pack
Single-ply roof renewal notice pack for an example estate.
- Open PDF
Golden Thread / CDE audit
Readiness audit with residual damper-test and engagement gaps.
- Open PDF
Estate BIM tier business case
Director CapEx narrative recommending Tier 2 stop point.
- Open PDF
Dispute chronology & evidence matrix
Solicitor briefing on ceiling staining chronology.
- Open PDF
UK planning readiness checklist
Householder garden-room readiness pack for an example LPA.
- Open PDF
Case workspace summary
Working file export for an upper-floor condensation case.
- Open PDF
Maintenance completion report
On-site dictated closer replacement with before/after photo slots.