Installable field app
Survey on site. Sync when you can.
Add this page to your iPhone or Android home screen for a single-tool or all-tools field shell. Fire door surveys save offline on the phone — even in basements and plant rooms — then sync to the team list or export a desk pack for laptop PDFs and client email.
Purchase unlocks the same way as the desk tools: one premium tool, or the all-tools plan for the full hub.
Field modules
Fire door inspection
Offline complete-survey flow, unique door list, team sync, desk export. Photos and branded PDF stay on the full desk form when you are back online.
Open fire door field surveySection 20 consultation pack builder
Desk-first for now — open the full tool when you have signal. Field capture for these packs is next.
Open desk toolGolden Thread / CDE readiness audit
Desk-first for now — open the full tool when you have signal. Field capture for these packs is next.
Open desk toolEstate BIM tier business case
Desk-first for now — open the full tool when you have signal. Field capture for these packs is next.
Open desk toolDispute chronology & evidence matrix
Desk-first for now — open the full tool when you have signal. Field capture for these packs is next.
Open desk toolCase workspace
Desk-first for now — open the full tool when you have signal. Field capture for these packs is next.
Open desk toolUK planning application readiness checklist
Desk-first for now — open the full tool when you have signal. Field capture for these packs is next.
Open desk toolMaintenance completion report
Desk-first for now — open the full tool when you have signal. Field capture for these packs is next.
Open desk tool
Install on a phone
- Open this page in Safari (iOS) or Chrome (Android).
- Use Share → Add to Home Screen, or the browser Install app prompt.
- Launch from the home-screen icon — it opens as a standalone field shell.