Tools
Tools
Free triage helpers and premium pack generators — ventilation checks, AST clause matching, Section 20 packs, fire-door inspection, and more.
How to use this section. Free triage helpers and premium pack generators are listed below. Related guides and topic pages sit alongside for more background.
Free tools
Retrospective BIM tier selector
Before scanning an occupied block: answer plans, Golden Thread/fire gaps, cascade maintenance, Section 20 quantities, AIM readiness, and twin CapEx — get a suggested stopping tier (1–4) for the resident pack.
BIM verification checklist
Is this project BIM-governed or only modelled in 3D? Tick OIR, PIR, AIR, EIR, responsibility matrix, BEP, CDE, meetings/minutes, and COBie compiled through delivery.
Loft ventilation triage
Upper-floor damp that looks like rain is often a cold loft with no through airflow — especially after retrofit loft insulation or a re-roof with token tile vents. Tick eaves clearance, entry-and-exit airflow, sealed underlay/vent detailing, extract outdoors, and winter trickle vents.
Subfloor ventilation triage
Ground-floor damp that looks like rising damp is often buried air bricks under a suspended timber floor — drives, patios, conservatories, and extensions seal the void. Tick opposite vents, clearance, void path, then drains and bridging.
AST clause matcher
UK Assured Shorthold Tenancy repair clauses in plain English: pick Gov Model, NRLA, OpenRent, ARLA, or DIY template — or paste a clause — for landlord vs tenant duties, s11 / Fitness / CRA overrides, and action steps.
Dew point calculator
Enter air temperature and relative humidity. See dew point, absolute humidity, and whether a measured surface will condense — including tropical reverse-drive examples.
Fire door gap & closer checker
Check head and jamb gaps against the BS 8214 2–4 mm band, threshold clearance with a drop seal, and whether the closer latches from a part-open position. Field notes cover manufacturer repairs, uneven floors, and holes in the leaf.
Premium tools
Generate Section 20 consultation packs, Golden Thread audits, maintenance completion reports (dictate on site), BIM business cases, dispute matrices, and related resident or client documents. Unlock via /subscribe — £15 one-off document, £25/month single tool, or £40/month all tools (optional annual). Client PDFs contain the survey content only — not surveyor issue instructions.
Subscription
Section 20 consultation pack builder
Turn estate facts into a notice-ready plain-English works description, technical annex checklist, document list, and recovery-risk flags for Landlord and Tenant Act 1985 Section 20 qualifying works.
Subscription
Golden Thread / CDE readiness audit
Scored gap list for HRB registration, Accountable Person duties, fire-door and compartmentation evidence, damper tests, and CDE states — exportable action list for managing agents and APs.
Subscription
Fire door inspection pack
Full single-door survey: location, floor, unique reference, door type, certification evidence grade, leaf/frame/hardware, gaps, threshold, glazing, pass/fail/replace-leaf summary, photo enclosures, and branded client PDF. Free BS 8214 gap checker stays open.
Subscription
Estate BIM tier business case
Resident / director CapEx narrative for retrospective BIM tiers 1–4: what problem is being bought, what is excluded, and how Section 20 / service-charge reasonableness is explained.
Subscription
Dispute chronology & evidence matrix
Facts → candidate mechanisms → falsifying checks → documents to request. For expert-witness prep and solicitor briefing — not a court determination.
Subscription
Case workspace
Save named building cases with region, construction, symptoms, and working notes in this browser. Ordering aid only — not a diagnosis product.
Subscription
UK planning application readiness checklist
England/UK-only validation triage: drawings, ownership certificates, DAS triggers, local lists, and parallel Building Regulations / party-wall tracks. Not sold as a US or overseas permit pack.
Subscription
Maintenance completion report
Dictate the job on site — client, instruction, work done, materials, handover — attach before and after photos, and generate a branded completion PDF without waiting until you are back at a desk.