Skip to content

Premium · Fire safety tools

Fire door inspection — one door, full evidence pack.

Record location, floor, unique reference, door type, certification evidence, leaf and frame condition, hardware, gaps, threshold, and glazing. The summary tags pass, fail, replace leaf, or non-fire-rated, then exports a branded PDF with photos for your client. Not a BM TRADA certificate.

Checking access…

Free reading: fire door surveying compliance and inspection protocol. Quick perimeter triage without subscription: gap & closer checker.