How walls, floors, and roofs are put together around the world — the main construction methods, and how they differ by region and climate.

How to use this section. The groups below collect the main construction types by climate and building tradition. Comparison notes for other places sit alongside those groups.

Frequently asked

Which UK & Ireland wall types share the same moisture physics despite different national codes?

Solid brick and solid stone (absorb–dry, lime-open, BRE Digest 245 bridging logic), early uninsulated cavities and later insulated cavities (clear cavity + ties + trays; BS 8104 exposure), timber frame with ventilated cladding cavities, suspended timber floors needing air bricks (Approved Document C), and cold/warm roof build-ups (the layers of the roof) under BS 5250. England, Wales, Scotland, and Ireland publish different Approved Documents / Technical Handbooks, but capillary rise (moisture climbing from the ground through the masonry), wind-driven rain, condensation at dew point, and cavity bridging are the same physics. Name how the wall is built first; cite the local code for compliance, not for inventing a different moisture cause. Country aliases on this site resolve into the UK & Ireland construction group for that reason.

Why countries are grouped

There are only so many ways to build walls and roofs. Wind-driven rain on temperate masonry, monsoon on short-eaved RC frames, light timber in continental extremes, and thick earthen mass in deserts produce different failure lists. Unique local names (Thai Hong Thaeo, Cambodian Pteas Tiam, Vietnamese tube house) stay on the record — under the shared Southeast Asian group. Guide for readers outside the UK: construction in other regions.

  • UK & Ireland

    Temperate maritime — wind-driven rain, mild winters, cool summers

    Covers: England, Wales, Scotland, Northern Ireland, Republic of Ireland

  • Southeast Asia

    Hot-humid monsoon — high RH, intense rainfall, termite pressure, heavy AC use

    Covers: Thailand, Cambodia, Laos, Myanmar, Vietnam, Malaysia, Singapore, parts of Indonesia and the Philippines

  • North America

    Continental extremes — cold winters, hot summers, storm and freeze–thaw belts

    Covers: United States, Canada, similar light-frame and masonry suburbs elsewhere

  • Hot-arid / desert

    Hot-arid — large diurnal swings, low rainfall, intense solar gain

    Covers: Southwest USA adobe belt, North Africa & Middle Eastern thick masonry courtyards, similar desert courtyard traditions worldwide

UK & Ireland

Solid brick and stone, early and insulated cavity walls, timber floors and cold pitched roofs dominate ordinary houses. Bond patterns and cavity dates travel across the islands; national regulations differ, but the walls and roofs — and how they fail with moisture and movement — are shared. Northwestern European solid masonry overlaps this tradition; English Approved Documents are cited where the corpus already uses them, not as the only lawful code.

Walls · Mostly before 1919, lingering into the 1930s

Solid brick walls

Brickwork with no cavity, commonly one brick thick (about 215 mm), laid so headers show in the bond. Rain is absorbed and then dries. The wall fails when it is stopped from drying, or when ground or rainwater is given a path it did not have.

Walls · Pre-1919 solid (Georgian / Victorian / Edwardian) through early cavity transition

Solid stone walls

Thick stonework, often with a rubble core, built to be vapour-open. Many houses that look like stone are a stone face on brick or a stone-faced cavity. Thickness and the core decide the moisture behaviour, not the pretty face.

Walls · From the 1920s, the ordinary wall by the 1950s and 1960s

Early uninsulated cavity walls

Two leaves with a clear cavity and metal ties, usually no insulation. Stretcher bond on the outside. The cavity only works if it stays clear. Ties made before 1981 are the corrosion generation.

Walls · Widening from the 1980s, and the normal new wall from the 1990s

Insulated cavity walls

A cavity wall with partial or full-fill insulation and, in competent modern work, stainless ties. Different risks from the 1960s uninsulated cavity: cold bridges at openings, saturated fill, and details that bridge the cavity in the name of structure.

Walls · From the 1960s in volume housing; brick-slip systems widespread more recently

Timber frame, including brick slips

The structure is the timber frame. Brick, brick slips, boarding, or render are cladding. There should be a drained and ventilated cavity outside the sheathing, a breather membrane, and a vapour-control layer on the warm side. Injecting the cladding as if it were a Victorian wall is a category error.

Walls · Throughout the twentieth century, and still the inner leaf of cavities

Concrete block walls

Dense or aircrete blocks. As the inner leaf of a cavity they are ordinary. As a single leaf — garages, rear extensions, boundary walls, some whole houses — they have no cavity, they crack at changes of construction, and rain goes through the joints.

Inside the building · All periods

Internal partitions

The wall inside the room: masonry, timber stud, or metal stud. They carry different loads and they do not share one damp mechanism. A masonry partition can bypass the damp-proof course. A stud partition cannot have rising damp.

Walls · Mostly 1940s to 1970s, including Wimpey No-Fines

No-fines concrete

Cast concrete made without fine aggregate, usually rendered. It is not the same thing as a designated prefabricated reinforced-concrete system. It has its own cracking, render, and reinforcement details.

Walls · Mostly 1940s to 1960s

System-built and designated PRC houses

Houses built from a named system: precast concrete panels, concrete columns, steel frames, and others. Some prefabricated reinforced-concrete systems are designated defective under the Housing Act 1985. The name of the system comes before any opinion.

Floors and roofs · The ordinary ground floor until concrete slabs became common

Suspended timber ground floors

Joists and floorboards over a ventilated void, often with local concrete under hearths or chimney breasts. Opposite air bricks are not optional — block them and the void stays wet, often misread as rising damp.

Floors and roofs · Common from the mid-twentieth century, and the usual floor now

Ground-bearing concrete floors

Concrete on hardcore, with a damp-proof membrane. Failures are at the edges, at the membrane, and occasionally in the hardcore. The slab is not a ventilated void and should not be given air bricks.

Floors and roofs · The ordinary house roof

Cold pitched roofs

Insulation at ceiling level and a cold, ventilated loft above it. Condensation on the underside of the felt — loft sweating — is what happens when the void is sealed and moist air cannot leave.

Floors and roofs · All modern periods, and many extensions

Flat roofs

A flat roof is a weathering and an upstand problem first. Cold decks also condense. Ponding, low upstands, and outlets blocked by leaves are the usual leaks.

Floors and roofs · Victorian cellars to modern waterproofed basements

Basements and below-ground accommodation

Spaces below external ground level: historic cellars that were never dry rooms, and modern basements designed to a chosen waterproofing grade under BS 8102.

Walls · Late twentieth century to present retrofit and some new-build renders

External wall insulation (EWI) and thick render systems

Insulated boards and multi-coat renders fixed to the outside of masonry or framed walls — energy upgrade that changes rain, vapour, and junction behaviour.

Floors and roofs · Modern residential blocks, extensions, and landscaped podiums

Green roofs and podium decks

Planted or paved roofs and decks over occupied space — waterproofing, drainage layers, and root barriers under soil or finishes.

Southeast Asia

Modern urban houses and shophouses are typically reinforced-concrete post-and-beam frames with fired-clay brick or AAC block infill and cement render. Traditional raised timber (and bamboo) houses remain widespread in rural and heritage stock. Reverse vapour drive under air-conditioning, monsoon rain on short eaves, soft delta soils, and subterranean termites are the shared physics — not a Thailand-only story.

North America

Ordinary houses are often light timber platform (or older balloon) frames with stud walls, sheathing, cavity insulation, and cladding — not English cavity masonry. CMU block and insulated concrete form (ICF) walls are also widespread, especially where fire, wind, or energy codes favour masonry or continuous concrete. Moisture stories centre on vapour control, ice dams, cladding rain, crawlspace or basement damp, and opening flashings. Hot-arid adobe and courtyard mass traditions in the Southwest and deserts worldwide are listed under Hot-arid, not here.

Hot-arid / desert

High-mass earth (adobe, rammed earth) or thick fired masonry courtyard walls, small openings, and shaded courts temper day–night temperature swings. Light insulated timber dressed to look like adobe is a different way of building and fails differently. Rain is rare but flash floods and parapet drainage still matter; vapour drive under heavy cooling can reverse.