UK & Ireland · Floors and roofs
Ground-bearing concrete floors
Concrete on hardcore, with a damp-proof membrane. Failures are at the edges, at the membrane, and occasionally in the hardcore. The slab is not a ventilated void and should not be given air bricks.
Common from the mid-twentieth century, and the usual floor now
How to recognise it
- A solid feel underfoot, screed, tiles or sheet flooring, no air bricks serving that room
- The damp-proof membrane may show as a line at the edge if it was turned up, and it may be absent in early slabs
- A change from timber in the hall to solid in the kitchen is a usual alteration
How it is built
- Hardcore, sometimes a blinding, a membrane, a slab, then insulation and screed in later work. The order varies with the decade
- The membrane should join the wall damp-proof course. Where it does not, the edge is the wet line
- Some post-war hardcore contained materials that can swell. Sulfate-related slab heave is a known historic problem, not the first guess for every crack
How it behaves
Moisture from the ground is stopped by the membrane. If there is no membrane, or it is punctured, or the screed and plaster bridge the wall course, the edge of the room shows a band that looks like rising damp and sometimes is simply the bridge. Condensation on a cold uninsulated slab is also common and feels like a damp floor. A slab does not rot. Timber fixed on top of a damp slab does.
What to watch
- Plaster and screed taken down across the wall damp-proof course
- A patio above the membrane level
- Timber battens on a slab with no membrane, then a survey that blames the skirting
- Historic hardcore heave where the slab has hogged and the partitions have cracked in a matching pattern
Frequently asked
What goes wrong with ground-bearing slabs when there is no DPM or the edge detail is buried?
Without a damp-proof membrane continuous with the wall DPC, ground moisture reaches the screed and edge band — often misread as rising damp (BRE Digest 245 bridging / missing barrier logic; Approved Document C). Buried edges (patios above membrane level, plaster/screed taken across the wall DPC) recreate the same bridge. Cold uninsulated slabs also surface-condense (BS 5250). Historic sulfate heave in contaminated hardcore is a separate materials mechanism. Check membrane continuity at the perimeter before injecting walls; a slab needs edge detailing, not air bricks meant for a void.
Mechanisms that belong here
- Rising damp and a bridged damp-proof course
Ground moisture held in the base of a masonry wall. Genuine capillary rise (moisture climbing from the ground through the masonry) happens. It is diagnosed far more often than it is present. A bridged damp-proof course is the usual real version.
- Surface condensation
Room air meeting a cold surface, dropping water, and often growing black mould. It is the most common damp mis-sold as rising damp.
- A leak from a pipe, a roof, or a fitting
Liquid water from a failed pipe, a flat roof, a valley, a flashing, or an air-conditioner condensate. It is ordinary until it is called rising damp.
- Subsidence
The ground under part of the building goes down, and the building follows. Clay shrinkage, leaking drains, and weak or eroded ground are the usual domestic causes. It is not the same as a crack.
- Settlement
The building or its fill compressing soon after it was built, then usually stopping. Old, stable settlement is a record, not a live defect.
- Heave
Clay swelling and lifting part of the building, commonly after a tree is removed or after a dry period ends. The opposite of shrinkage subsidence, and often caused by the attempt to cure it.