Skip to content

Premium

What premium unlocks.

Pathology records stay free. Premium opens the pack generators: £15 for one document on a chosen tool, £25 a month for one tool, £40 a month for the full suite, or £400 a year (two months free).

Used for receipts and billing support if you leave one.

Used only for the £15 one-off and £25 single-tool subscription. All-tools plans unlock everything.

  • £15 · one-time

    One-off document

    One paid unlock for a single pack on the tool you choose — finish the notice, audit, or matrix for that matter.

  • £25 · per month

    One tool · monthly

    Keep regenerating branded PDFs for one workflow — pick the tool below before you buy.

  • £40 · per month

    All tools · monthly

    Section 20, Golden Thread, maintenance completion, fire-door packs, and the rest of the suite.

  • £400 · per year

    All tools · annual

    Same full suite at £400 / year (two months free versus paying £40 each month).

Log in

Already purchased on another device? Log in here. Manage billing to change or cancel a plan.

What you get

  • Section 20 consultation pack builder

    Turn estate facts into a notice-ready plain-English works description, technical annex checklist, document list, and recovery-risk flags for Landlord and Tenant Act 1985 Section 20 qualifying works.

  • Golden Thread / CDE readiness audit

    Scored gap list for HRB registration, Accountable Person duties, fire-door and compartmentation evidence, damper tests, and CDE states — exportable action list for managing agents and APs.

  • Fire door inspection pack

    Full single-door survey: location, floor, unique reference, door type, certification evidence grade, leaf/frame/hardware, gaps, threshold, glazing, pass/fail/replace-leaf summary, photo enclosures, and branded client PDF. Free BS 8214 gap checker stays open.

  • Estate BIM tier business case

    Resident / director CapEx narrative for retrospective BIM tiers 1–4: what problem is being bought, what is excluded, and how Section 20 / service-charge reasonableness is explained.

  • Dispute chronology & evidence matrix

    Facts → candidate mechanisms → falsifying checks → documents to request. For expert-witness prep and solicitor briefing — not a court determination.

  • Case workspace

    Save named building cases with region, construction, symptoms, and working notes in this browser. Ordering aid only — not a diagnosis product.

  • UK planning application readiness checklist

    England/UK-only validation triage: drawings, ownership certificates, DAS triggers, local lists, and parallel Building Regulations / party-wall tracks. Not sold as a US or overseas permit pack.

  • Maintenance completion report

    Dictate the job on site — client, instruction, work done, materials, handover — attach before and after photos, and generate a branded completion PDF without waiting until you are back at a desk.

Subscribe · Premium tools · Buildopedia