Skip to content

Professionals

Professionals

Official registers and competence pathways by country and region — so you can appoint the right local professional.

How to use this section. Registers and competence pathways are organised by country and region. Each profession links to the official register — public registers, not a paid list of contractors.

Surveyor adviceBefore you appoint

Using word of mouth? Demand a portfolio first.

Word of mouth remains one of the most reliable ways to find good tradespeople and consultants. But a recommendation from a neighbour or relative is only the starting point. Any competent professional creates a portfolio — a tangible success list of previous projects they take genuine pride in.

Before signing any agreement or paying any deposit, protect yourself with this 5-step due diligence checklist:

1

Request their portfolio of similar buildings and in-progress work

A contractor who builds modern timber frames may have no understanding of breathable Victorian lime mortar. Ask to see projects on buildings of your property’s exact era and construction type. crucially, ask for in-progress construction photographs (e.g. cavity tray installation, sub-floor air bricks, DPC continuity, lintel padstones, roof valley leadwork) — not just cosmetically staged, freshly painted living rooms.

2

Speak directly to past clients from 12–24 months ago

Don’t only speak to someone whose job finished yesterday. Speak to clients whose extensions or damp remediation survived one or two wet English winters. Ask them: Did any damp, leaks, or cracks return? Did the firm stick to the agreed price? When unforeseen issues arose, how were they handled? Were snags addressed promptly?

3

Verify statutory registrations & active insurances

Never take someone’s claimed credentials on trust. If they call themselves an “architect”, verify them on the statutory ARB Architects Register (it is an offence in UK law to trade as an architect if not on this register). If they claim to be a Chartered Surveyor, verify them on the RICS Register; for Chartered Builders, check the CIOB Directory. Request current certificates for Professional Indemnity Insurance (PII) for consultants, and Public Liability (£2m–£5m minimum) for building contractors.

4

Insist on an itemised written specification — never a verbal quote

Never accept a single-line quote such as “Damp proofing to front room: £4,500”. The specification must describe the diagnosed cause, the exact products and materials (e.g. Natural Hydraulic Lime NHL 3.5, stainless steel helical wall ties, specified membrane types), waste removal, and what happens if concealed structural defects are uncovered during strip-out.

5

Put a standard contract in place with staged payments & retention

Use a recognised, consumer-friendly standard form contract such as the JCT Home Owner Building Contract or JCT Minor Works. Payments should be tied to completed, inspected site milestones (e.g. foundations poured, roof watertight, plaster complete). Never pay 100% upfront or hand over substantial cash deposits. Hold a 3% to 5% retention for 3 to 6 months after completion so the builder is contractually incentivised to return and rectify any shrinkage cracks or snags.

Why Buildopedia avoids commercial directory sites

Websites like Checkatrade, TrustATrader, Rated People, or Bark are commercial lead-generation platforms. Their business model is charging tradespeople monthly subscription fees or selling customer contact details as leads.

Commercial directory sites

  • Trades pay monthly subscriptions or lead fees to be listed.
  • Vetting is largely administrative (checking ID and insurance).
  • They do not inspect site workmanship or audit British Standards compliance.
  • Customer reviews can be solicited from friendly contacts or easily gamed.
  • No statutory disciplinary body to strike off incompetent practitioners.

Chartered & statutory registers

  • Entry requires accredited university degrees and rigorous professional APC exams.
  • Members are bound by strict, legally enforceable codes of professional conduct.
  • Independent disciplinary tribunals with the statutory power to revoke licenses.
  • Mandatory Professional Indemnity Insurance (PII) protecting consumer claims.
  • Separate the person diagnosing the fault from the contractor selling the remedy.

Official public registers & authorities

Always instruct independent diagnostic professionals before commissioning invasive remedial work.

UK & Ireland

Royal Institution of Chartered Surveyors (RICS)

Chartered building surveyor (RICS)

When to instruct: When the question is what is wrong with an existing building: damp, cracking, roof defects, timber decay, or before buying or altering a property. An independent Chartered Building Surveyor (MRICS / FRICS) is paid purely to diagnose root causes and does not sell remedial treatments. Essential for Level 3 Building Surveys, Party Wall awards (Party Wall etc. Act 1996), and damp investigations following the RICS / Historic England Joint Position Statement.

What to avoid: Do not expect a mortgage valuation or standard homebuyer checklist to be an intrusive pathology investigation. Avoid 'free surveys' from damp-proofing contractors whose commercial model relies on selling chemical creams, wall-tie replacements, or tanking membranes.

Due diligence & portfolio check: Ask for sample Level 3 building survey reports or specific defect investigation reports on properties of similar age and construction type. Confirm they carry current Professional Indemnity Insurance (PII) and have no commercial interest in remedial contracting firms.

UK & Ireland

Chartered Institute of Building (CIOB)

Chartered builder & construction manager (CIOB)

When to instruct: When appointing a principal contractor, project manager, or builder for extensions, structural knock-throughs, major alterations, or conservation repairs. Members of the Chartered Institute of Building (MCIOB / FCIOB) and CIOB Chartered Building Companies are vetted for competence, financial health, quality control, and adherence to an enforceable professional code of conduct.

What to avoid: Never enter into major works on informal verbal promises or un-itemised quotes. Avoid contractors who demand large upfront cash payments or refuse to sign a recognised standard building contract (e.g. JCT Home Owner or Minor Works) with a formal retention sum.

Due diligence & portfolio check: Ask to visit a recently completed project of similar scope, not just staged marketing photos. Look for photos of structural milestones in progress (foundations, DPC continuity, lintel padstones, roof flashings). Ask for contact details of two previous clients from 12–24 months ago to confirm how any defect snags were addressed.

UK & Ireland

Architects Registration Board (ARB) & Royal Institute of British Architects (RIBA)

Architect (ARB & RIBA)

When to instruct: When planning significant design changes, space reconfiguration, complex residential extensions, or planning applications in conservation areas or on listed buildings. In the United Kingdom, the title 'Architect' is legally protected under Section 20 of the Architects Act 1997; anyone trading under that title must be on the statutory ARB register.

What to avoid: Anyone can call themselves an 'architectural designer', 'draftsman', or 'extension planner' without being legally regulated. An architect is also not a substitute for diagnosing existing damp if the wall is already wet; commission an independent survey first so the design solves the moisture path rather than trapping it.

Due diligence & portfolio check: Check their ARB registration number online. Review their portfolio for projects of comparable scale, era, and aesthetic quality. Inquire whether their previous projects successfully navigated local planning authority constraints and achieved statutory building regulations sign-off without costly redesigns.

UK & Ireland

Chartered Institute of Architectural Technologists (CIAT)

Chartered architectural technologist (CIAT)

When to instruct: When you need detailed construction drawings, building regulations specifications, junction detailing, and practical buildability for domestic extensions, loft conversions, or alterations. Chartered Architectural Technologists (MCIAT) specialise in the science and technology of architecture — ensuring that insulation, ventilation, air-tightness, and damp-proofing details work practically on site.

What to avoid: Do not assume standard outline planning drawings are sufficient for builders to build from. Without detailed 1:20 or 1:10 construction junction drawings, contractors will guess thermal bridge and DPC details on site.

Due diligence & portfolio check: Request examples of Building Regulations full-plans drawing packages and technical junction details (e.g. cavity wall tie-in to existing solid masonry, cavity tray detailing, insulation continuity). Confirm MCIAT chartered status and PII coverage.

UK & Ireland

Institution of Structural Engineers (IStructE) & Institution of Civil Engineers (ICE)

Chartered structural engineer (IStructE & ICE)

When to instruct: When sizing load-bearing steel beams (RSJs / universal beams), calculating masonry padstones, removing chimney breasts, designing foundation footings near trees or shrinkable clay, underpinning, or investigating progressive structural cracks. Chartered engineers (MIStructE / CEng) produce the structural calculations and calculations packages required by Building Control.

What to avoid: Do not allow a builder to guess steel beam sizes or install steelwork without an engineer's calculations. Never instruct underpinning based solely on a commercial contractor's quote before an independent structural engineer has monitored and diagnosed the movement.

Due diligence & portfolio check: Request examples of structural calculations and layout drawings submitted to and approved by local authority building control for similar knock-throughs or foundation conditions. Confirm chartered status (CEng / MIStructE) and Professional Indemnity Insurance.

UK & Ireland

BM TRADA Q-Mark & FIRAS (Warringtonfire)

Certified fire door & passive fire protection contractors

When to instruct: When installing, maintaining, or surveying timber fire doors (FD30S / FD60S) and passive firestopping in Higher-Risk Buildings (HRBs), student accommodation (PBSA), or communal blocks under the Fire Safety (England) Regulations 2022 and Building Safety Act 2022.

What to avoid: Never use general rough carpenters or maintenance handymen to fit or repair fire doors using off-the-shelf screws, timber packs, or generic pink expanding foam. A non-certified repair on an FD30S/FD60S doorset invalidates the manufacturer test evidence and leaves building owners and Accountable Persons criminally liable.

Due diligence & portfolio check: Demand BM TRADA Q-Mark Fire Door Installation/Maintenance or FIRAS certification numbers. Ask for audited records of door schedule compliance (plug tags, BS 8214 leaf-to-frame gaps 2–4 mm, drop-down threshold seals per BS 8214 / manufacturer undercut, and through-bolted panic ironmongery). Confirm they issue formal certificates of conformity for every door remediated.

UK & Ireland

Government & Industry Pre-Qualification Frameworks

Vetted contractor accreditation & quality schemes

When to instruct: When shortlisting general building contractors, electrical, heating, or fenestration installers, look for established pre-qualification and government-endorsed quality schemes that carry third-party technical audits, financial checks, and dispute resolution schemes.

What to avoid: Be extremely cautious of commercial lead-generation websites (e.g. Checkatrade, TrustATrader, Rated People) where businesses pay monthly subscriptions for customer leads and reviews can be self-solicited. Those directories are advertising brokers, not technical regulators; they do not perform site inspections or audit compliance with British Standards.

Due diligence & portfolio check: Verify that the contractor holds current membership in recognised industry registers: TrustMark (government-endorsed with dispute resolution), Constructionline (pre-qualified for financial health and H&S), or relevant competent person schemes (Gas Safe for boilers, NICEIC/NAPIT for electrics, FENSA for glazing). Always request a written portfolio of completed local projects and speak directly to previous clients.

UK & Ireland

Local Authority Building Control (LABC) & Building Safety Regulator

Planning authorities & building control

When to instruct: The local planning authority determines statutory planning permission, conservation area consents, and Lawful Development Certificates (LDCs). Building control — either the Local Authority (LABC) or a registered private Building Control Approver — enforces the Building Regulations 2010 (as amended) / Approved Documents (structure, fire safety, moisture resistance, ventilation, energy efficiency).

What to avoid: A planning approval is not a building regulations completion certificate. Neither of them guarantees that a contractor has executed flashing or DPC junctions correctly on site. A Party Wall notice is separate again and is governed by civil law (Party Wall etc. Act 1996), not the council.

Due diligence & portfolio check: Ensure your design team has experience dealing with your specific local authority planning policies, Article 4 directions, and local drainage authorities (water company build-over agreements).

UK & Ireland

RICS · UK BIM Framework · buildingSMART

BIM / information management professionals (ISO 19650)

When to instruct: When commissioning Exchange Information Requirements, a Common Data Environment, COBie/AIM population, retrospective scan-to-BIM on existing blocks, or checking whether a job is BIM-governed rather than only modelled in 3D. Also when choosing a construction procurement route that must carry UK BIM Framework / Construction Playbook information duties. Look for practitioners who can evidence ISO 19650 process (OIR/AIR/EIR, BEP, MIDP) — often Chartered Surveyors with BIM pathways, architectural technologists, or information managers trained against the UK BIM Framework.

What to avoid: Do not appoint on software brand alone (‘we use Revit’) or accept a digital-twin brochure as proof of information management. Avoid locking residents into proprietary viewers with no IFC/COBie export. Marketing ROI percentages are not a substitute for sampled asset data.

Due diligence & portfolio check: Ask for anonymised EIR extracts, CDE state diagrams, and a COBie or AIM sample verified against installed assets. Confirm who the Lead Appointed Party for information will be, and whether fire-PFP survey is priced separately from full architectural/MEP modelling. Cross-read Buildopedia /procurement for how traditional vs design & build appointments must bind those duties.

UK & Ireland

The Property Institute (IRPM pathway) · ARMA

Residential managing agents & block managers (IRPM / TPI · ARMA)

When to instruct: When leaseholders need a managing agent who understands service charges, Section 20 consultation, residential block fabric programmes, and — on higher-risk buildings — how Accountable Person / Golden Thread information duties interact with day-to-day management. Use professional body membership directories rather than paid lead brokers.

What to avoid: Do not treat a managing agent as a substitute for an independent building surveyor or fire-door certifier. Agents coordinate; they should not sell damp creams or uncertified fire-door repairs. Avoid appointments that cannot explain Landlord and Tenant Act 1985 reasonableness or produce clear major-works consultation packs.

Due diligence & portfolio check: Ask how they handled a recent Section 20 programme on similar construction, how fire-door and FRA records are stored, and whether they will table retrospective BIM tiers with residents before scanning. Confirm Professional Indemnity Insurance and which principal (RMC / freeholder / RTM) they report to.

Southeast Asia

Architect Council of Thailand (ACT) & Council of Engineers (COE)

Licensed architect or civil engineer (Thailand)

When to instruct: Any structural alterations to a reinforced concrete frame, deep foundation piling in Bangkok / central clay basins, structural load changes, and official permit applications (Bai Anuyat Kor-1) under the Thailand Building Control Act B.E. 2522. Licensed professionals can then guide you to competent builders — Buildopedia does not list trade directories.

What to avoid: Never use Western masonry specifications (e.g. chemical DPC creams) on tropical reinforced concrete structures. Never assume an unpiled extension can be tied rigidly into a deep-piled main building in Bangkok clay without differential settlement tearing the structure apart.

Due diligence & portfolio check: Verify that the engineer holds a valid professional license (Kor-Sor / Samakom Vitsawakam) and can provide blow-count logs and load-test records from previous driven micropile foundations.

Official Public Registers & Authoritative Links:

Southeast Asia

Board of Engineers Malaysia (BEM)

Professional Engineer (Malaysia)

When to instruct: Structural design, submission of plans, and regulated engineering practice on Malaysian projects — including RC-frame houses, high-rise, and geotechnical work on tropical soils. Use BEM’s register to confirm a Professional Engineer before major alterations; they are the route into competent local contractors, not a Buildopedia builder list.

What to avoid: Do not import UK cavity-wall or chemical DPC specifications onto tropical RC infill without local review. Do not assume Singapore or Thai licences automatically authorise Malaysian submissions.

Due diligence & portfolio check: Confirm current BEM registration grade, relevant branch (civil/structural), and recent projects of similar climate and construction. Ask how monsoon detailing, termite exposure, and AC-driven reverse vapour risk were handled.

Official Public Registers & Authoritative Links:

Southeast Asia

Professional Engineers Board Singapore (PEB)

Professional Engineer (Singapore)

When to instruct: Regulated engineering work and plan submissions in Singapore. PEB registration is the statutory check before appointing structural or civil engineers on local buildings — including high-rise residential and shophouse alterations in a hot-humid climate.

What to avoid: Do not treat a foreign PE stamp as a substitute for PEB registration where Singapore law requires it. Do not skip Qualified Person duties on structural works.

Due diligence & portfolio check: Verify PEB registration online, confirm the branch of engineering, and review prior projects with similar loading, excavation, or conservation constraints.

Official Public Registers & Authoritative Links:

Southeast Asia

Building and Construction Authority (BCA) · PEB Qualified Persons

BIM / digital delivery (Singapore — BCA & openBIM)

When to instruct: When a Singapore project needs coordinated BIM for BCA e-submission / CORENET (and CORENET X timelines), or when writing ISO 19650-style information requirements into design–build or traditional appointments that must clear regulatory digital submission.

What to avoid: Do not treat a marketing BIM model as CORENET-ready. OpenBIM IFC exchange expectations and Qualified Person responsibilities sit with locally registered professionals — not with an offshore modeller alone.

Due diligence & portfolio check: Ask for prior BCA BIM e-submission experience at similar GFA, CDE governance evidence, and how IFC/openBIM packages were validated before portal upload. Confirm the PEB/architect QP who will stamp.

Southeast Asia

CIDB · Board of Engineers Malaysia (BEM) · JKR public-works BIM policy

BIM / digital delivery (Malaysia — CIDB & JKR pathways)

When to instruct: When Malaysian government or private clients require BIM on qualifying projects (including Treasury/JKR thresholds for government building and infrastructure works), or when appointing information managers who understand CIDB BIM standards alongside BEM-licensed engineers.

What to avoid: Do not assume a UK BIM Level 2 folder structure satisfies Malaysian tender BIM schedules without reading the current circular. Software logos are not CIDB competency.

Due diligence & portfolio check: Confirm BEM registration where engineering stamps are required, ask for CIDB-aligned BIM capability evidence, and check how the team priced EIR/CDE deliverables inside the chosen procurement route.

Southeast Asia

Architect Council of Thailand (ACT) · Council of Engineers (COE)

BIM-capable design teams (Thailand)

When to instruct: When a Thai project wants ISO 19650-style information management or scan-to-BIM on existing stock. Thailand’s permit path still runs through licensed ACT architects and COE engineers; BIM adoption is largely owner- and project-led rather than a single UK-style central mandate — appoint licensed professionals who can evidence CDE/IFC/COBie practice.

What to avoid: Do not invent a nationwide Thai BIM mandate. Do not let an unlicensed foreign modeller replace Kor-1 stamping duties.

Due diligence & portfolio check: Verify ACT/COE licences first, then ask for sample EIR/BEP extracts and open-format exports from prior Bangkok or regional projects. Use licensed professionals to introduce competent BIM coordinators and builders.

North America

NCARB / state architectural boards · provincial Canadian associations · AIA

Licensed architect (USA / Canada)

When to instruct: Significant design changes, additions, and permit drawings on North American houses — including light timber platform frame, CMU, and ICF stock. In the US, licensure is state-regulated (NCARB facilitates reciprocity); in Canada, provincial architectural associations regulate title and practice. AIA membership is professional, not a licence by itself.

What to avoid: Anyone can market as a ‘home designer’ without a licence in many jurisdictions. A licence does not replace diagnosing existing moisture; commission investigation before sealing the outside walls and roof. Do not apply English cavity-tie logic to platform-frame brick veneer without reading the drained cavity.

Due diligence & portfolio check: Verify state or provincial licence status, review projects of comparable climate zone and construction (veneer, crawlspace, cold attic), and confirm who stamps the permit set.

North America

NCEES / state PE boards · Engineers Canada / provincial regulators

Licensed Professional Engineer (USA / Canada)

When to instruct: Structural alterations, foundation design, beam sizing, retaining walls, and investigation of progressive movement on North American light-frame, CMU, or ICF buildings. US practice is state PE licensure (NCEES exams underpin many boards); Canadian practice is provincial engineering regulators under Engineers Canada’s framework.

What to avoid: Do not let a general contractor size structural members without sealed calculations where the code requires an engineer. Do not diagnose ‘settlement’ vs framing shrinkage from one crack photo.

Due diligence & portfolio check: Confirm active PE / P.Eng. licence for the project state or province, request comparable sealed calculation packages, and ask how crawlspace, frost line, or expansive soils were handled on prior jobs.

Official Public Registers & Authoritative Links:

North America

NBIMS-US (NIBS) · buildingSMART · licensed AIA / PE practice

BIM / VDC professionals (USA & Canada)

When to instruct: When US or Canadian owners need BIM/VDC on design–bid–build, design–build, CM-at-Risk, or IPD projects. There is no single federal US BIM mandate — requirements come from GSA, states, cities, and owners — guided by NBIMS-US and openBIM/IFC practice. Pair information managers with state-licensed architects or PEs who stamp permit sets.

What to avoid: Do not claim a nationwide US BIM law. Do not accept proprietary-only deliverables when the owner’s standard calls for IFC. Software certification is not a substitute for a PE/architect stamp where the code requires one.

Due diligence & portfolio check: Ask which owner or agency BIM standards the team has delivered (NBIMS, GSA, state DOT/digital engineering), sample COBie or facility data handovers, and how EIR language was written into the chosen delivery method.

Hot-arid

Local licensure (US state / provincial · Gulf & MENA municipal engineering authorities)

Licensed architects & engineers (hot-arid / desert projects)

When to instruct: Adobe, rammed earth, thick masonry courtyard houses, and desert concrete-block stock need designers who understand high thermal mass, vapour-open renders, parapet drainage, and flash-flood roof loads — not only insulated light timber dressed to look like adobe. In Southwest USA use state architectural / PE licences; in Gulf and North African jurisdictions use the municipal building authority’s licensed engineer/architect registers for permit stamps.

What to avoid: Cement waterproof coatings on earthen walls, sealing mass construction with impermeable systems copied from cold-climate codes, and appointing teams whose only portfolio is platform-frame stucco ‘pueblo style’.

Due diligence & portfolio check: Ask for mass-wall or thick-masonry projects that survived monsoon-rare storm seasons; verify the stamp that the local municipality will accept; confirm render and roof-edge details are vapour-open where earth fabric requires it.

Hot-arid

Municipal building authorities (e.g. Dubai Municipality) · local licensed engineers/architects

BIM for Gulf / UAE permitting & delivery

When to instruct: When UAE or wider Gulf projects hit municipal BIM permit rules (Dubai circulars for defined building categories; Abu Dhabi digital/BIM guidance) or client BIM specifications on design–build / EPC work. International BIM managers must work with locally licensed professionals who carry the municipal stamp.

What to avoid: Do not assume one emirate’s circular applies to another. Do not submit a design-only model that fails IFC or municipality checklist rules. Local licensure still governs permits.

Due diligence & portfolio check: Ask for prior permit BIM submissions in the same emirate, evidence of ISO 19650-aligned CDE use, and the named local engineer/architect of record. Confirm open-format exchange if multiple international designers are involved.

Surveyor reminder: If someone gives you a diagnosis and in the same breath offers to sell you their proprietary chemical cream, render, or cladding system, get an independent second opinion. A Chartered Building Surveyor has no commercial interest in what product you buy.