Damp, mould, movement, materials failure, and biological attack — with checks that help you tell likely causes apart, including notes for other climates and regions.

How to use this section. Topics are grouped by type of failure — damp, mould, movement, materials, and biological attack. Each topic explains how that cause works and what checks help tell causes apart. Notes for other climates and regions are included where practice differs.

Frequently asked

What diagnostic sequence should a surveyor follow before naming a damp mechanism?

Order before product. (1) Ask what changed — new windows, cavity fill, raised patio, blocked air bricks, a gutter failure, clothes dried indoors — because damp that started after a change is naming the change. (2) Name the construction before any remedy: solid brick/stone, early cavity, insulated cavity, timber frame, slab or suspended floor; brick slips and stud partitions cannot have rising damp. (3) Map pattern on paper: height, elevation, rain vs cold weather vs humidity, chimney/gutter/pipe alignment; photograph with a scale. (4) Read the outside first — Approved Document C clearance (~150 mm ground to DPC), gutters that run, open joints, trays, weeps, air bricks. (5) Distrust the conductance meter: BRE Digest 245 — a high reading is not rising damp; where money will be spent, use oven-dried drilled samples separating free and hygroscopic moisture (BS 6576 context). (6) Name the mechanism only when confirm/falsify tests fit; if two still fit, buy the separating observation, not a ‘safe’ injection. Write construction, observations, leading mechanism, falsifiers, and the evidence grade of any repair. BS 5250 frames moisture risk; do not tank a lime wall or inject a condensating bedroom to be thorough.

Outside the UK

The physical causes are the same worldwide; which ones are likely depends on how the building is put together. Tropical AC reverse condensation, termites, and RC corrosion already have dedicated records. For how these show up on US timber frames, in Southeast Asia, and on hot-arid walls, open defects in other regions.