A coating the wall cannot breathe through

Cement render, hard cement pointing, or a waterproof coating on a solid wall that was built to dry. The face spalls, salts build up, and the inside gets wetter.

Mechanism

Lime mortar and lime plaster move a little and let moisture evaporate. Dense cement is stiffer than the brick or the stone, so the masonry fails first, and it is much less vapour-open, so water that enters at a crack cannot leave. External cement render taken down over the damp-proof course also bridges it. Internally, a waterproof coating produces the same trap. The repair is to take off what does not belong and put back a compatible coat, after the rain path and the ground levels are honest.

Often confused with

  • Penetrating damp through a crack, which may have started the problem the coating then made worse
  • Frost damage on a sound wall that is simply wet from a gutter
  • Sulfate attack, which has its own chemistry in chimneys and in some renders

What would support it

  • Hard cement on an old solid wall, hollow or cracked, with soft or spalled brick behind
  • Pointing standing proud while the brick edges have eroded
  • A waterproof coating on the inside of a wall that is still being wetted

What would rule it out

  • The wall is a modern cavity wall rendered as designed, and the crack is a movement joint that was never cut
  • The damage is a rusting lintol or a tie pattern, not the face of the brick

Common mistakes to avoid

  • Do not repoint lime-built brick in a strong cement because it looks neat
  • Do not paint a spalling solid wall with a waterproof masonry paint and call it maintained
  • Do not tank the inside instead of removing the cement skin

Frequently asked

Can cement render or tanking on a lime solid wall trap moisture and blow the face?

Yes. Lime-built solid masonry was designed to absorb and evaporate; dense cement render, hard cement pointing, or waterproof tanking/paint slows drying, stiffens the face relative to the brick or stone, and concentrates failure at the weaker unit — spalling, hollow render, and salts blowing decorations. Historic England / SPAB practice and BS 5250 moisture logic both push compatible, vapour-open repairs. External cement taken down over a DPC also bridges the course. If pointing stands proud while brick arises erode, or cement on a Georgian/Victorian solid wall is hollow and cracked, strip the incompatible coat, fix rainwater and ground levels, then repoint or render in lime. Do not tank the inside of an above-ground lime wall to hide a cement skin problem.

Remedies

  • Pre-1919 Georgian–Victorian solid walls of brick and stone were built to absorb some rain and dry. Lime lets them. Hard cement pointing, cement render, and waterproof coatings keep the water in and then the face of the wall fails.

  • Repoint open joints, repair cracked render, replace failed sills and copings, and put back cavity trays and weep holes so rain sheds off the outside instead of crossing the wall.

  • A coating that promises to hold damp in the wall. It can hide a stain for a season. It does not stop rain, ground moisture, or condensation, and on pre-1919 breathable solid masonry it stops the wall drying.

  • A waterproof cement barrier on the inside face. Proper tanking is a below-ground system designed to BS 8102. Used on an ordinary damp wall above ground, it traps moisture in the masonry and moves the damage.