Repair the rain-shedding fabric
Repoint open joints, repair cracked render, replace failed sills and copings, and put back cavity trays and weep holes so rain sheds off the outside instead of crossing the wall.
The mechanism is well described, and this is the repair set out in a British Standard, an Approved Document, BRE guidance, or equivalent mainstream practice. It still has to match the building in front of you.
When it works
Wind-driven rain is crossing a cavity or soaking a solid wall through open joints, cracked render, or a missing tray over an opening. The mortar has to be no stronger than the masonry it sits in.
When it fails or causes harm
The wall is lime-built and the repair is dense cement. That is a different defect. Repointing also does nothing for condensation, a plumbing leak, or tie corrosion.
Frequently asked
What is the correct specification sequence for defective pointing before any DPC product is considered?
Fabric before injection. (1) Confirm rain or splash is the wetting path (BS 8104 exposure / weather timing). (2) Repair rainwater goods and ground levels that bury the DPC (Approved Document C ~150 mm). (3) Rake and repoint open joints, repair cracked render, sills, and copings with mortar no stronger than the masonry — lime on lime-built solid walls (Historic England). (4) Reinstate cavity trays and weeps where openings or abutments shed into the wall. (5) Only after bridging and rain paths are cleared, and BRE Digest 245 / BS 6576 sampling still shows true capillary rise (moisture climbing from the ground through the masonry), consider a chemical DPC. Defective pointing is not a DPC sale; injection into a wall still being rained on fails.
Mechanisms it is attached to
- Penetrating damp
- A coating the wall cannot breathe through
- Movement between a frame and its infill
- Window and door installation defects
- EWI and thick-render moisture traps
- Cavity wall insulation failure and bridging
- EIFS and rainscreen water intrusion (North America)
- Slab-edge damp and termite risk at ground junctions
- Chimney stack decay and flue condensation
- Parapet and abutment weathering failures