Skip to content

Defect · structure

Movement between a frame and its infill

The concrete frame and the brick or block panel are different materials. They shrink, creep, and move with temperature at different rates. The crack follows the joint between them.

Mechanism

In a typical modern Thai house or shophouse, and in many concrete-framed buildings elsewhere, the walls do not hold the building up. The frame does. The infill is built into or against it and then rendered across the joint, so the first movement shows as a crack in the render exactly along the column and along the beam. That crack lets in monsoon rain if it is left open, but it is not evidence that the foundation has failed. Raking cracks across the panel, a frame out of plumb, or doors racking through several bays are a different and more serious reading.

Often confused with

  • Subsidence of the frame
  • Reinforcement corrosion, if the arris of the column is spalling
  • Ordinary render shrinkage, which is a finer random map cracking

What would support it

  • The crack tracks the column and the beam, not a diagonal through the bay from ground to roof
  • The frame is still plumb and openings still work
  • The joint was rendered across with no bead or sealant

What would rule it out

  • Columns leaning, floors sloping across more than one bay, or cracks through the frame itself
  • Rust and spalled cover on the column

Common mistakes to avoid

  • Do not underpin a house because render has cracked on the column line
  • Do not fill the joint with rigid mortar and expect it not to crack again
  • Do not remove infill and assume it was non-load-bearing without someone competent checking that frame

Remedies

  • Tell-tales, dated photographs with a scale, and a note of doors that stick. Digest 251 asks what repair the damage would need, not merely how wide one crack is. A single visit cannot show whether movement has stopped.

  • Repoint open joints, repair cracked render, replace failed sills and copings, and put back cavity trays and weep holes so rain sheds off the outside instead of crossing the wall.

  • Spalling concrete with rust stains is steel expanding as it corrodes, usually because cover was thin or carbonation and chlorides have reached the bar. The repair cuts back to sound steel, cleans it, and reinstates cover in a system meant for the exposure.