Guide · Southeast Asia
A damp ground floor in a Thai concrete-frame house
Do not import a British rising-damp certificate. Read the frame, follow the monsoon down the outside, then look at the air-conditioning. Most of what gets called damp here is rain, splash, a drip, or condensation.
- 1
Do not start with an injected damp-proof course
A tide-like band on rendered block at the bottom of a wall, in a monsoon climate, is often rain splash, a path or planter built against the wall, a slab edge with no drip, or condensate from an air-conditioner. Ground salts and a moisture profile through the wall are what would make it capillary rise (moisture climbing from the ground through the masonry). Those tests are rarely what the person quoting the injection has done.
- 2
Read the structure before the stain
Columns and beams carry the house. The brick or block between them is infill until someone competent shows otherwise. A crack that runs along the column and then along the beam is the panel and the frame moving differently, and the render telling the truth. It lets rain in if it is open. It is not, on its own, subsidence. Rust stains, cracked cover, and steel showing are corrosion of the reinforcement. That is an engineer's repair: cut back, clean the bar, restore cover. Skimming over rust leaves the bar to keep expanding.
- 3
Follow the water from the sky down
Short eaves, terrace roofs, low parapets, and pipes through upstands are the usual paths. Staining that appears with rain and dries after is rainwater until proved otherwise. Watch the outside during rain if you can do it safely. An outlet blocked by leaves will put a pond over the upstand and then put the pond indoors.
- 4
Then look at the air
A room sealed and cooled, with humid air leaking in, will wet its coldest surfaces. That is condensation. A waterproof coating on the inside holds the next season's rain in the wall if the real path was outside, and it does nothing for mould fed by the room air. Extract and a sane use of the air-conditioning beat a miracle paint.
- 5
Timber is a separate inspection
Door frames, roof timbers, and built-in furniture should be checked for mud tubes and hollowed sections. Termites and a leak often arrive together because both like damp wood. A licensed operator deals with the colony. An engineer decides what timber is still doing a job. Fixing the leak is what stops the replacement timber being eaten or rotted in its turn.
- 6
Who is allowed to decide
Alterations to the frame, anything that might be structural infill, and concrete repairs that affect the bars belong with a licensed Thai architect or engineer. Buildopedia does not list contractors and does not pretend to quote the Thai building regulations clause by clause. The mechanisms above are building physics. The permission to design the repair is local.