UK & Ireland · Floors and roofs
Flat roofs
A flat roof is a weathering and an upstand problem first. Cold decks also condense. Ponding, low upstands, and outlets blocked by leaves are the usual leaks.
All modern periods, and many extensions
How to recognise it
- A near-flat covering: felt, asphalt, single ply, or a liquid coating, with outlets, drips, and upstands at walls
- A cold deck has insulation below the deck and a void that was supposed to be ventilated. A warm deck has insulation above the deck. They fail differently
- Parapets and abutments are part of the roof, not part of the wall
How it is built
- The covering has a finite life and a proper fall. Dead-flat decks pond
- Upstands should be high enough to tolerate a leaf in the outlet. Skirtings chased into the wall, with a cover flashing, are doing the real work
- A balcony that is also a roof over a room combines this with the consequences of getting it wrong indoors
How it behaves
Rainwater should be on the covering and then in the outlet. It is indoors when the covering has split, the outlet has blocked, or the upstand is lower than the puddle. Separately, a cold deck with moist air in the void condenses on the underside of the deck and rots it even when the covering is new. Ventilating a warm roof because 'roofs need air' can be the wrong detail. BS 5250 is the document that sorts the build-up.
What to watch
- Outlets, parapets, and the chase of the upstand
- A cold deck with no ventilation and a bathroom below
- A new covering laid on a wet, rotten deck
- Walking surfaces without protection, then a leak blamed on the felt alone
Frequently asked
What is the difference between a cold-deck and warm-deck flat roof?
Cold-deck: insulation below the structural deck with a void that was meant to be ventilated — indoor vapour can condense on the cold underside and rot timber even under a new covering (BS 5250; BS 6229). Warm-deck: insulation above the deck so the structure stays warm, with falls (minimum finished 1:80 under BS 6229) and waterproofing on top — the established direction for ponding and condensation repairs, also aligning with Approved Document L upgrades. Identify which build-up you have before adding vents or another coating; do not ventilate a warm deck by habit, and do not re-cover a rotten cold deck without converting falls and insulation correctly.
Mechanisms that belong here
- A leak from a pipe, a roof, or a fitting
Liquid water from a failed pipe, a flat roof, a valley, a flashing, or an air-conditioner condensate. It is ordinary until it is called rising damp.
- Penetrating damp
Rain getting through the envelope (the outside walls and roof): open joints, cracked render, failed trays, a bridged cavity, or a solid wall in driving rain that can no longer dry.
- Condensation inside the wall or roof layers (interstitial condensation)
Water condensing inside the construction, not on the paint. Typical of cold roofs, timber frames with a broken vapour-control layer (on the warm side of the wall), and solid walls insulated on the inside without a moisture assessment.
- Surface condensation
Room air meeting a cold surface, dropping water, and often growing black mould. It is the most common damp mis-sold as rising damp.
- Flat roof ponding & cold-deck deck condensation
Rainwater standing in pools >48 hours due to inadequate structural falls (< 1:80), combined with cold-deck vapour condensation that rots the structural timber deck from beneath.