Skip to content

About

Who writes Buildopedia, and what it is for.

A free technical reference on how buildings are built, why they fail, and how they are repaired — for homeowners, surveyors, managing agents, and other building professionals.

Browse 24 construction records, 32 building defects, 32 remedies, and 37 practical guides, plus tools, fire safety, residential block management, historic buildings, BIM, procurement, planning, and tenancy topics. England is the primary depth for statute and day-to-day practice. Counterpart notes for other territories — including wider UK context where relevant, the United States, Southeast Asia, and parts of Europe — sit beside that England core so how walls are built and the physics can travel without exporting the wrong product name or Act.

Understand a problem before money is spent on the wrong fix. Free to read. No advertising. No named contractors, no ranked local firms, and no product or materials directory. Public professional registers live on /find; they point at institutions, not paid listings.

Evidence grades keep the difference clear. Established means the cause is described in a standard or mainstream guidance and the repair follows from it. Conditional means it works only when that diagnosis is right. Caution means the approach is heavily marketed, known to harm traditional fabric, or backed mainly by those selling it. Standards are copyright: this site summarises what they are for and sends you to them. Nothing here is a survey of a particular building.

Section overviews include construction, defects, remedies, fire safety, block management, historic, BIM, procurement, planning, and tenancy. Corrections welcome at info@bimmapping.co.uk. Optional pack-generator tools on /subscribe may require paid unlock; the encyclopaedia topics behind them stay free.

The author

Matthew Howell BSc (Hons), MSc

Technical Author & Founder | Digital Building Consultant

LinkedIn profile (opens in a new tab)

Authored and curated by Matthew Howell. Holds a BSc (Hons) in Building Surveying from University of Wolverhampton and a Master's degree (MSc) in Building Information Modelling (BIM).

With over 25 years of hands-on professional practice in England, Matthew has worked extensively in defect pathology, building surveys, moisture investigation, structural failure analysis, and BIM coordination. For the majority of his working life he was Managing Director of a maintenance company working predominantly on residential leasehold blocks — the caseload skewed toward developments with recurring fabric failure. He passed IRPM Level 1 specifically to understand managing-agent process, service charges, and Section 20 consultation. He has also worked directly as a fire door surveyor across Higher-Risk Buildings (HRBs) and Purpose-Built Student Accommodation (PBSA), auditing fire doorsets (FD30S/FD60S), drop-down seals, twisted frames, and post-carpentry compliance.

The purpose of Buildopedia is to put clear, plain-English explanations in front of homeowners, the general public, and professionals alike — how buildings are put together, what goes wrong with them, and which laws and standards those issues sit under. It is meant as a free encyclopaedia of building facts and practical assistance: concise and usable, not a brochure for selling work or products.

Contributions

Contributions from professionals in the industry are welcome. Articles, field experience, and technical notes that help homeowners and practitioners understand buildings better can be offered for inclusion. Where contributed work is published on the site, the contributor is credited as the author of that section.

If you want to add to Buildopedia — whether a full topic or a carefully written account of practice — write to info@bimmapping.co.uk.

Professional appointment

Where complex defects, formal disrepair proceedings, or high-value statutory disputes need bespoke investigation and expert determination, that is a separate professional appointment — described on /instruct. The free encyclopaedia does not replace that appointment, and it does not replace the public registers on /find.