Skip to content

Professional inquiries

Expert appointment for complex disputes and statutory programmes.

Instruct a formal professional appointment for complex defects, disrepair proceedings, or high-value statutory disputes — after a conflict and capacity check, separate from the free encyclopaedia.

What stays free

Construction, defect, remedy, fire, block-management, historic, BIM, planning, tenancy, and procurement records remain free to read. Expert appointment does not turn those pages into marketing.

Appointment scopes that may be discussed

  • Expert witness & dispute support

    Independent technical opinion for latent defects, damp and moisture disputes, fire-door / compartmentation failures, and related leasehold or construction claims. Chronology, mechanism separation, and what would falsify each theory.

  • Building Safety Act & Golden Thread readiness

    Practical review of Accountable Person / Principal Accountable Person information duties, fire-door and passive-fire evidence gaps, CDE hygiene, and what a managing agent or RMC still needs before a regulator or FRA asks.

  • Section 20 & major-works technical packs

    Survey-grade description of works, options, access, and evidence for Landlord and Tenant Act 1985 consultation — so notices are about the right questions, not ‘repair roof as necessary’.

  • Residential block building-defects advice

    Single-ply roofs, soil stacks, acoustic floors, balcony detailing, cascade maintenance, and service-charge spirals — second opinions before CapEx or contractor replacement.

  • BIM appointments & retrospective information programmes

    ISO 19650 / EIR / responsibility-matrix advice; retrospective scan-to-BIM tier selection for occupied estates; COBie / AIM readiness without buying a twin brochure.

  • Technical second opinion

    A named mechanism review before money is spent on a remedy, a product, or a scan — for owners, solicitors, managing agents, and design teams who want the encyclopaedia applied to one building.

How appointment works

  1. Email info@bimmapping.co.uk with the building type, the question in dispute, the jurisdiction, and any deadline or hearing date.
  2. A conflict, capacity, and jurisdiction check follows — including whether a locally attending professional is the correct first appointment instead.
  3. If an appointment can proceed, fee and scope are confirmed in writing before substantive work starts.
  4. For day-to-day appointments of other professionals, use the public registers on /find— not a paid contractor directory.

Principles

  • The encyclopaedia stays free to read. Expert appointment is optional paid professional work.
  • Fees are negotiated after a short conflict and capacity check — not listed as a product catalogue price on building-defect pages.
  • Appointment is not a survey of a property until a written instruction says so; it is not legal advice; it is not a substitute for a local professional with appropriate Professional Indemnity Insurance on the building in front of you. Next step: use /find to shortlist a competent local professional, then put the brief in writing before any opening-up or paid remedy.
  • Where conflict, jurisdiction, or capacity prevents an appointment, that will be stated clearly with a pointer to public registers on /find rather than inventing a substitute.

Premium tools (subscription)

Separate from expert appointment: pack-generator tools that export client-ready outlines. The underlying encyclopaedia topics stay free; the generators require paid unlock via /subscribe.

  • Section 20 consultation pack builder

    Available · subscription

    Turn estate facts into a notice-ready plain-English works description, technical annex checklist, document list, and recovery-risk flags for Landlord and Tenant Act 1985 Section 20 qualifying works.

  • Golden Thread / CDE readiness audit

    Available · subscription

    Scored gap list for HRB registration, Accountable Person duties, fire-door and compartmentation evidence, damper tests, and CDE states — exportable action list for managing agents and APs.

  • Fire door inspection pack

    Available · subscription

    Full single-door survey: location, floor, unique reference, door type, certification evidence grade, leaf/frame/hardware, gaps, threshold, glazing, pass/fail/replace-leaf summary, photo enclosures, and branded client PDF. Free BS 8214 gap checker stays open.

  • Estate BIM tier business case

    Available · subscription

    Resident / director CapEx narrative for retrospective BIM tiers 1–4: what problem is being bought, what is excluded, and how Section 20 / service-charge reasonableness is explained.

  • Dispute chronology & evidence matrix

    Available · subscription

    Facts → candidate mechanisms → falsifying checks → documents to request. For expert-witness prep and solicitor briefing — not a court determination.

  • Case workspace

    Available · subscription

    Save named building cases with region, construction, symptoms, and working notes in this browser. Ordering aid only — not a diagnosis product.

  • England/UK-only validation triage: drawings, ownership certificates, DAS triggers, local lists, and parallel Building Regulations / party-wall tracks. Not sold as a US or overseas permit pack.

  • Maintenance completion report

    Available · subscription

    Dictate the job on site — client, instruction, work done, materials, handover — attach before and after photos, and generate a branded completion PDF without waiting until you are back at a desk.

Author credentials and professional background: /about. General technical information — not a survey, a specification, or advice on a particular property. The same stain can have more than one cause. A repair that is established for one of them can damage the building if the cause is wrong. Instruct a competent local professional before opening up structure or paying for a remedy.