Record cracks properly

Tell-tales, dated photographs with a scale, and a note of doors that stick. Digest 251 asks what repair the damage would need, not merely how wide one crack is. A single visit cannot show whether movement has stopped.

The mechanism is well described, and this is the repair set out in a British Standard, an Approved Document, BRE guidance, or equivalent mainstream practice. It still has to match the building in front of you.

When it works

Damage is being classified and someone needs to know if it is progressive. The record covers inside and outside, pipes, and floors, not one photograph of a crack over a door.

When it fails or causes harm

Monitoring is used as a delay while water is still being lost from a drain under the foundation. Recording is not a substitute for stopping a cause that is already obvious.