Skip to content

Defect · structure

Settlement

The building or its fill compressing soon after it was built, then usually stopping. Old, stable settlement is a record, not a live defect.

Mechanism

New loads compress soil a little. Poorly compacted fill compresses more. The cracks form early, often taper, and if the cause was initial compaction they do not grow years later. An extension can settle relative to the house it joins, which opens a joint at the junction. That is a detail and a foundation issue for the extension, not proof that the whole house is subsiding. Calling old settlement 'subsidence' is how sound houses acquire underpinning quotes.

Often confused with

  • Live subsidence from clay, trees, or a drain
  • Heave
  • Shrinkage of a new blockwork wall or a new slab, which is the material, not the ground

What would support it

  • The cracks date from early life, or from just after an extension, and reliable evidence says they have not grown
  • Fill or a change in foundation depth at the junction
  • No active cause: drains sound, no new vegetation effect, no seasonal opening and closing

What would rule it out

  • Cracks are lengthening or widening now
  • A drain is leaking under the bay that is moving
  • The pattern reverses after a tree is removed — that is heave

Common mistakes to avoid

  • Do not underpin historical, stable cracking
  • Do not ignore a junction crack on a brand-new extension; that one may still be moving

Frequently asked

Do stable old cracks that have not grown for years still require underpinning?

No. Historic settlement that finished after early compaction or an old extension junction is a record, not a live foundation scheme. BRE Digest 251 categories 0–2 are commonly aesthetic or redecoration-level; width alone does not order piles. Confirm stability with owner history, decorated crack faces, and unchanged tell-tales or measurements over seasons; confirm drains sound and no new clay/tree mechanism. Institution of Structural Engineers subsidence practice puts cause before underpinning. Monitor and maintain stable cracks; investigate only where movement resumes, a drain fails CCTV, or a new extension junction is still opening. Underpinning stable old settlement is how sound houses acquire unnecessary structural works.

Remedies

  • Tell-tales, dated photographs with a scale, and a note of doors that stick. Digest 251 asks what repair the damage would need, not merely how wide one crack is. A single visit cannot show whether movement has stopped.

  • Most cracking that frightens people is aesthetic or serviceability damage, and a large part of true foundation movement stabilises once the cause is dealt with. Drains, trees, and a period of measurement come before concrete under the wall.

  • ConditionalUnderpinning

    Extending the foundation to a bearing the movement will not reach. It is a real engineering repair for continuing movement once the cause is understood. It is a poor first response to a crack.

  • Installing sectioned prestressed concrete I-micropiles (18m–21m) to reach stiff clay/sand layers in Central Thailand soft marine soils, paired with an independent 25mm structural movement joint separating the new extension from the main building.