Scaffolding and temporary works — liability in plain English

Who typically owns design, inspection, and public protection for scaffolds and temporary works — orientation for clients and agents, not a design manual.

  1. 1

    Temporary works are designed systems

    Scaffolds, propping, and facade retention need competent design and inspection — not ‘the scaffold firm will sort it’ without appointments (CDM 2015; Approved Document A structural thinking on the permanent works interface).

  2. 2

    Name the duty holders

    Client, principal contractor, and temporary-works designer/coordinator roles matter on projects that need them. Domestic clients still need clear contracts.

  3. 3

    Public protection and neighbours

    Fans, netting, and licences for highway scaffolds protect third parties. Damage claims often start with unclear responsibility for ties and sheeting.

  4. 4

    Handover and weekly inspections

    Scaffolds require inspection regimes. Using an unfinished or altered scaffold is a classic site failure.

  5. 5

    Interface with permanent fabric

    Ties into historic masonry and load paths into incomplete steels need engineering — see knocking-through guidance on this site.