Scaffolding and temporary works — liability in plain English
Who typically owns design, inspection, and public protection for scaffolds and temporary works — orientation for clients and agents, not a design manual.
- 1
Temporary works are designed systems
Scaffolds, propping, and facade retention need competent design and inspection — not ‘the scaffold firm will sort it’ without appointments (CDM 2015; Approved Document A structural thinking on the permanent works interface).
- 2
Name the duty holders
Client, principal contractor, and temporary-works designer/coordinator roles matter on projects that need them. Domestic clients still need clear contracts.
- 3
Public protection and neighbours
Fans, netting, and licences for highway scaffolds protect third parties. Damage claims often start with unclear responsibility for ties and sheeting.
- 4
Handover and weekly inspections
Scaffolds require inspection regimes. Using an unfinished or altered scaffold is a classic site failure.
- 5
Interface with permanent fabric
Ties into historic masonry and load paths into incomplete steels need engineering — see knocking-through guidance on this site.