Guide · UK & Ireland
CDM roles on small residential projects (England / GB)
Client, principal designer, and principal contractor duties under CDM 2015 on domestic extensions and refurbishments — plain English, not a substitute for HSE advice on a live project.
- 1
CDM applies to construction work, including many domestic jobs
The Construction (Design and Management) Regulations 2015 manage health and safety risk on construction projects in Great Britain. Domestic clients still have duties; in practice many transfer to the contractor or designer depending on appointments — check current HSE domestic-client guidance.
- 2
Name the three duty-holder roles
Client (who the project is for), principal designer (who plans and co-ordinates design-stage health and safety), and principal contractor (who co-ordinates the construction phase). On tiny jobs one business may wear more than one hat if competent and appointed.
- 3
Pre-construction information and the construction phase plan
Known hazards (asbestos, structural instability, shared flues, overhead services) must be gathered before work starts. The principal contractor’s construction phase plan is not paperwork theatre — it is how the site stays controlled.
- 4
CDM is not Building Regulations approval
CDM manages health and safety process. Building Regulations / Approved Documents manage technical standards for the finished building. You can have a tidy CDM file and still fail moisture or structure details — run both tracks.
- 5
Asbestos and refurbishment
Refurbishment surveys before disturbing fabric remain critical (HSG264). CDM does not replace asbestos duties — see the asbestos refurbishment guide on this site.