Skip to content

UK & Ireland · Walls

Timber frame, including brick slips

The structure is the timber frame. Brick, brick slips, boarding, or render are cladding. There should be a drained and ventilated cavity outside the sheathing, a breather membrane, and a vapour-control layer on the warm side. Injecting the cladding as if it were a Victorian wall is a category error.

From the 1960s in volume housing; brick-slip systems widespread more recently

frameventedslipsVCL
The frame is the structure. Slips or brick are cladding over a cavity that has to drain.

How to recognise it

  • A hollow, dry-lined inside face, often with services in the stud zone. Tapping does not sound like solid brick
  • A half-brick outer leaf in stretcher bond, tied back to the frame, is the older arrangement. Brick slips are thinner slices on a carrier or rail, often with a shallow reveal and a special corner piece
  • At an opening you may see the slip thickness, the carrier, or a cavity that does not match a masonry inner leaf
  • Movement joints and a sole-plate detail at the base. The ground-floor wall is not one lump of masonry

How it is built

  • Studs, sheathing, breather membrane on the cold side, a cavity that must stay open, then the cladding
  • Vapour-control layer and plasterboard on the warm side. Gaps at sockets and at the ceiling line are where moist air gets into the frame
  • Slips are a finish. They do not have wall ties in the cavity-wall sense, and they do not have a damp-proof course that does the job of a masonry wall

How it behaves

Rain is stopped and drained at the cladding cavity. If that cavity is filled, rendered over at the vents, or bridged at the base, the sheathing stays wet and decays, often with only a modest stain inside. Warm air leaking into the same cold zone causes condensation inside the wall or roof layers (interstitial condensation), which looks similar. Ground-level trouble is a sole plate, a buried cavity, or splash — not rising damp through the slips. These buildings still get ordinary surface condensation if they are lived in without extract.

What to watch

  • Foam or render that closes the ventilated cavity
  • A chemical damp-proof course specified into slips or into the outer leaf
  • Musty smells and soft boarding at the base, with a patio built up to the cladding
  • Bathroom extract ducted into the frame or the cavity

Frequently asked

Are brick slips on timber frame a rising-damp problem or a cladding/moisture-path problem?

Cladding / moisture-path. The structure is the timber frame; slips are a finish on a carrier with a drained, ventilated cavity, breather membrane, and warm-side vapour control (BS 5250). Ground-level stains are usually buried cavity vents, splash, or a wet sole plate — not capillary rise (moisture climbing from the ground through the masonry) through the slips. Injecting a chemical DPC into slips or the outer leaf is a category error (BRE Digest 245 logic applies to masonry paths from ground, which slips are not). Keep the cladding cavity open, fix base clearances (Approved Document C), and refuse rising-damp products sold against brick-slip meter readings.

Mechanisms that belong here

  • Surface condensation

    Room air meeting a cold surface, dropping water, and often growing black mould. It is the most common damp mis-sold as rising damp.

  • Condensation inside the wall or roof layers (interstitial condensation)

    Water condensing inside the construction, not on the paint. Typical of cold roofs, timber frames with a broken vapour-control layer (on the warm side of the wall), and solid walls insulated on the inside without a moisture assessment.

  • Penetrating damp

    Rain getting through the envelope (the outside walls and roof): open joints, cracked render, failed trays, a bridged cavity, or a solid wall in driving rain that can no longer dry.

  • A leak from a pipe, a roof, or a fitting

    Liquid water from a failed pipe, a flat roof, a valley, a flashing, or an air-conditioner condensate. It is ordinary until it is called rising damp.

  • Moisture and decay under a timber ground floor

    A suspended timber floor with a wet, still void after designed air-brick airflow was blocked. Joists, wall plates, and ends built into the wall decay; ground-floor damp is often mis-sold as rising damp.

  • Subsidence

    The ground under part of the building goes down, and the building follows. Clay shrinkage, leaking drains, and weak or eroded ground are the usual domestic causes. It is not the same as a crack.

  • Settlement

    The building or its fill compressing soon after it was built, then usually stopping. Old, stable settlement is a record, not a live defect.

  • Termites in structural timber

    In Thailand, subterranean termites quietly remove timber. Mud tubes and hollow wood are the clues. They are not a standard English house defect, and a consumer spray is not a repair.