Skip to content
Conditional

Underpinning

Extending the foundation to a bearing the movement will not reach. It is a real engineering repair for continuing movement once the cause is understood. It is a poor first response to a crack.

It works when the diagnosis is right and the wall is the type the repair was made for. Misapplied, it wastes money or moves the water.

When it works

An engineer has identified ongoing foundation movement that will not be stopped by repairing a drain, managing vegetation, or waiting out a seasonal cycle, and has designed the underpinning for that ground, including the effect on neighbours.

When it fails or causes harm

It is sold from crack width alone, or installed while a drain still leaks, or used for heave it was not designed for. Partial underpinning of one corner of a house on clay can create a hard point and a new crack next to it.

Mechanisms it is attached to