Skip to content
Established

Deal with the cause, and monitor, before underpinning

Most cracking that frightens people is aesthetic or serviceability damage, and a large part of true foundation movement stabilises once the cause is dealt with. Drains, trees, and a period of measurement come before concrete under the wall.

The mechanism is well described, and this is the repair set out in a British Standard, an Approved Document, BRE guidance, or equivalent mainstream practice. It still has to match the building in front of you.

When it works

Cracks are being taken seriously: recorded with widths and dates, classified with the Digest 251 idea of ease of repair, and investigated for leaking drains, shrinkable clay, and vegetation. Many category 0–2 cracks need decoration and a cause, not a new foundation.

When it fails or causes harm

There is progressive movement, distortion, or a loss of bearing. Monitoring is not a way to avoid an engineer when the damage is already in the stability range. It also fails if a leaking drain is left running during the 'watch and wait'.

Mechanisms it is attached to