Skip to content
Established

Driven prestressed micropiles & structural settlement joint

Installing sectioned prestressed concrete I-micropiles (18m–21m) to reach stiff clay/sand layers in Central Thailand soft marine soils, paired with an independent 25mm structural movement joint separating the new extension from the main building.

The mechanism is well described, and this is the repair set out in a British Standard, an Approved Document, BRE guidance, or equivalent mainstream practice. It still has to match the building in front of you.

When it works

Adding a kitchen, living extension, or outbuilding in Bangkok or the Chao Phraya delta. Soft marine clay settles up to 5cm–10cm per year under shallow loads; matching pile depth to the main structure and isolating the frame prevents tearing.

When it fails or causes harm

Builders cast shallow 2-metre strip footings or drill short 4-metre augered piles in soft clay and rigidly tooth concrete beams into the main house. The extension will sink, shearing roof gutters, snapping drainage pipes, and cracking boundary walls.

Mechanisms it is attached to