A single-storey extension in England

Planning, the Building Regulations 2010 (as amended) / Approved Documents, and the junction with the house you already have. The junction is where the next damp problem and the next crack are made. The figures below were checked against Class A of the GPDO as published in 2026. They are not a decision on your house.

  1. 1

    Record the host building first

    Solid brick, cavity, timber frame, no-fines. The extension copies the host's moisture paths or blocks them. Tanking the back of a lime wall, filling a cavity solid at the abutment, or nailing a vapour barrier across a timber frame creates the defect you will be investigating in five years. If the question is what the present damp is, answer that before the slab is poured, not as a note on the drawing afterwards.

  2. 2

    Map drains, trees, boundaries, and the original house

    Public sewers can require a build-over or diversion agreement from the water company. Do not assume the manhole in the garden is private. Trees and shrinkable clay change the foundation. For permitted development, the original house is the house as first built, or as it stood on 1 July 1948 if it was already there. A previous owner's extension counts.

  3. 3

    Treat planning as a separate question from a good detail

    Many single-storey rear extensions to houses in England are permitted development under Class A. The ordinary depth limit is 4 metres for a detached house and 3 metres for any other house, and the height limit is 4 metres. Outside article 2(3) land — conservation areas, Areas of Outstanding Natural Beauty, National Parks, the Broads, World Heritage Sites — and outside Sites of Special Scientific Interest, a larger rear extension can go to 8 metres detached or 6 metres otherwise, but only with prior approval before work starts. That prior approval cannot be obtained afterwards. Eaves within 2 metres of a boundary are limited to 3 metres. Extensions and outbuildings together must not cover more than half the curtilage of the original house. Flats and maisonettes do not have these householder rights. Listed buildings need listed building consent. Article 4 directions can remove the rights on a particular street. Check the Planning Portal and the local authority for the property. Do not build from this paragraph.

  4. 4

    Building regulations still apply

    Permitted development is not an exemption from the Building Regulations 2010 (as amended). Structure, moisture, drainage, ventilation, fire, energy, and electrical safety are controlled through the current Approved Documents and building control, either the local authority or a registered building control approver. You want a completion certificate. Approved Document C, F, A, H, and L are the ones this kind of extension actually argues about.

  5. 5

    Appoint people in an order that can still change the drawing

    A designer who will draw the existing construction, not only the new room. A structural engineer for foundations, beams, and the junction. Building control early enough that details can change while they are still lines. A party wall surveyor if the Party Wall etc. Act 1996 applies, which it does for certain work on or near a boundary and for certain excavations in England and Wales. Notice periods are measured in months. Do not start with a builder's standard cavity tray and hope it suits a solid stone wall.

  6. 6

    Draw the junction as carefully as the kitchen

    Solid lime walls should still be able to dry. Do not close the back of the house with a vapour-tight lining and a cement skirt. Cavity walls need the cavity continued, with a tray and weeps at the abutment, not filled solid 'to knit it in'. Timber frame needs the ventilated cavity and the vapour-control layer continuous, and a gap the frame can move in. The new slab must not bury the existing damp-proof course. A new floor must not seal the air bricks that ventilate a suspended timber floor left next door.

  7. 7

    Ground and drains before concrete

    On shrinkable clay, or near a tree, the foundation depth is an engineering decision, not a trench the same depth as the house next door. A leaking drain is a classic cause of local subsidence. CCTV is cheap beside underpinning. Agree who will own the new manholes and whether the fall still works when the extension is standing on it.

  8. 8

    Design the moisture the room will actually make

    A room with no extract, drying clothes, and a cold bridge at the rear junction will grow mould, and the mould will be blamed on the builder's damp-proof course. Ventilation is Approved Document F. Heating that is never on in a spare room is a condensation design, whether or not anyone calls it that.

  9. 9

    Keep the record

    Specification, especially the junction. Building control completion certificate. Party wall award. Drainage agreement. Structural calculations. The next surveyor, and any agent asked about the extension later, will need them. A photograph of the cavity tray before it is covered is worth more than a paragraph in a brochure.