Defect · moisture
Rising damp and a bridged damp-proof course
Ground moisture held in the base of a masonry wall. Genuine capillary rise (moisture climbing from the ground through the masonry) happens. It is diagnosed far more often than it is present. A bridged damp-proof course is the usual real version.
Mechanism
Water from the ground can rise in fine pores until evaporation balances the rise, commonly well under a metre unless the wall is very thick or the plaster is wicking. It brings salts, notably chlorides and nitrates, which are the useful signature. BRE Digest 245 is blunt that an existing physical damp-proof course is unlikely to have failed: mortar in the cavity, render, plaster, or high ground has usually bridged it. A conductance meter cannot tell salts from free water, so a high reading at skirting level is not this diagnosis.
Often confused with
- Surface condensation at the base of a cold external wall
- Penetrating damp and splash from high ground
- Hygroscopic salts (salts that draw damp from the air) left behind after an old episode, which look damp whenever the air is humid
- A solid floor or a masonry partition built across the course, which is bridging, not a failed course
- A wet suspended timber void after air bricks were buried by a drive, patio, or extension — underfloor airflow failure, not capillary rise (moisture climbing from the ground through the masonry)
What would support it
- A band from the floor, fading out typically below about a metre, on the ground storey
- Chlorides or nitrates, not just fluffy white sulfate crystals
- Drilled samples showing a moisture gradient, wetter lower down, in the body of the wall and not only at the surface
- A buried, rendered-over, or plaster-bridged damp-proof course — look here before concluding the course has failed
What would rule it out
- Mould as the main symptom, especially above the ground storey or on glass
- The pattern turns on and off with rain or with a particular wind
- The mark is on an upper floor, on a chimney breast, or in the middle of a wall
- There is no masonry path from the ground (a timber stud partition, a brick-slip cladding)
Common mistakes to avoid
- Do not buy an injected damp-proof course from a meter reading
- Do not tank the inside of an above-ground wall
- Do not leave a bridged course in place and inject a new one above the bridge
- If salts are present, do not stop at the injection: contaminated plaster keeps the stain
Frequently asked
What confirms true rising damp versus a bridged DPC or high external ground?
True capillary rise (moisture climbing from the ground through the masonry) needs a masonry path from wet ground, a low band with chlorides and nitrates, and drilled samples showing free moisture decreasing with height in the body of the wall — not only a wet plaster face. BRE Digest 245 and BS 6576 set that standard; a conductance meter alone is not the diagnosis. Bridging is the usual real case: external ground, paths, or planters within ~150 mm of the DPC (Approved Document C), render or plaster taken across the course, mortar droppings on a cavity tray or at the base of the cavity, or a solid floor abutting the wall above the DPC. Expose and clear the bridge before concluding the course has failed. Injecting above a still-bridged course leaves the stain and the next surveyor the same problem.
How does damp bridging from raised paths, planters, or internal screeds defeat an otherwise sound DPC?
A DPC only works if water cannot bypass it. Raised paths, patio slabs, flower beds, and external insulation skirts that bury the course let ground and splash moisture enter the wall above the membrane. Internally, a screed, plaster, or tanking skim taken down over the DPC wicks the same way. In a cavity wall, mortar snots and debris at the base create a capillary bridge across the leaves. Digest 245 treats these as bridging, not DPC failure. Measure finished ground to DPC (target clearance about 150 mm under AD C), open the cavity base where accessible, and chase plaster off the course line. Lower ground, cut planters back, and break the plaster bridge — then reassess salts and residual moisture before any chemical injection.
Can blocked underfloor air bricks mimic rising damp on a suspended timber ground floor?
Yes — and it is a common first-contact miss. Opposite air bricks were built to dry the void under joists and boards (Approved Document C); when a new drive, patio, planter, conservatory, or solid extension seals them, the void stays moist for years and low wall/skirting damp is sold as rising damp. BRE Digest 245 still wants free-moisture gradients and salts before naming capillary rise (moisture climbing from the ground through the masonry); a conductance meter at skirting level is not that proof. Confirm construction (suspended timber vs slab), map whether airflow was designed in and whether it is still working — /tools/subfloor-ventilation. Restore clear opposite vents (/remedies/subfloor-ventilation) before chemical DPC quotes. If airflow is adequate, then expand to drains, bridging, and Digest 245 sampling.
Remedies
- EstablishedUncover the damp-proof course
Lower high ground, cut back render and plaster that bridge the damp-proof course, and keep finished ground about 150 mm below it, which is the clearance Approved Document C describes.
- EstablishedRestore ventilation under a timber floor
Suspended timber ground floors stay dry because air crosses the void through opposite air bricks. Drives, patios, planters, conservatories, and solid extensions that bury or seal those vents are a standard path to a wet void, joist decay, and ground-floor damp mis-sold as rising damp.
- EstablishedCompatible lime mortar, plaster, and render
Pre-1919 Georgian–Victorian solid walls of brick and stone were built to absorb some rain and dry. Lime lets them. Hard cement pointing, cement render, and waterproof coatings keep the water in and then the face of the wall fails.
- ConditionalReplace salt-contaminated plaster
Ground salts and flue salts stay in the plaster after the water has stopped. They pull moisture from humid air and destroy decorations. After the wetting mechanism is named, contaminated plaster has to come off; on pre-1919 lime fabric prefer breathable lime / renovation plasters — dense cement ‘salt-holding’ systems are not the default first action on traditional walls.
- ConditionalChemical damp-proof course
A chemical barrier injected to replace a missing damp-proof course. BS 6576 describes how to diagnose first and how to install one. It is a conditional repair, not a product to buy because a meter beeped.