Guide · UK & Ireland
Investigate ground-floor damp through underfloor airflow
First-contact order for low damp on suspended timber floors: name the construction, map designed opposite air bricks, find what landscaping or extensions blocked them, restore through-flow, then expand to drains, bridging, and true rising damp only if the void already breathes.
- 1
Name the floor before the product
Confirm suspended timber over a void (hollow boards, joists, air bricks) versus a ground-bearing slab. Concrete under a chimney breast or hearth can sit inside a timber floor — that island does not make the whole floor a slab. Air-brick remedies do nothing on a true solid floor; slab edges need DPM and bridging logic instead.
- 2
Ask the universal first questions
Should there be airflow here? How was airflow built into this construction? How could it have been impeded? For this era of house the answers are usually opposite air bricks front and back (or other opposing elevations) working with the DPC so the void can dry. Write that designed path on the notes before anyone quotes injection.
- 3
Walk every elevation for buried or sealed vents
Photograph air bricks relative to finished ground, drives, patios, planters, render, and conservatory or extension abutments. A pretty new front drive that covered the bricks is a classic delayed cause: over the next few years the underside stays moist and damp begins to show at skirtings. One open brick on a single elevation is not through-flow.
- 4
Prove the breeze can cross the void
Sight through vents past sleeper walls. Insulation, rubble, or a solid extension poured across the old vent line can leave external openings that still fail to ventilate timber rooms. Reinstate clear opposite paths or ducted continuity — Approved Document C / BS 5250. Pulling that airflow back is the efficient first remedy; wall treatments stay inefficient until it works.
- 5
Only then expand the investigation
If opposite vents are clear and the void path is open, ask next: damaged drain or water escape into the void? Rain or mortar failure on a wall? Bridged DPC / high ground (Digest 245)? True capillary rise (moisture climbing from the ground through the masonry) with salts and free-moisture gradient? Use /tools/subfloor-ventilation, /defects/subfloor-moisture, and /guides/investigate-damp. Do not sell a chemical DPC from a skirting meter reading while air bricks remain sealed.