Skip to content

Guide · UK & Ireland

Insurance-backed guarantees vs evidence-graded remedies

What a contractor ‘guarantee’ or insurance-backed warranty usually covers — and why it is not the same as a correct moisture or structure diagnosis.

  1. 1

    Read what is guaranteed

    Many damp-proofing guarantees cover the injected product against ‘rising damp returning’, not against wrong diagnosis, rain, or condensation. Exclusions hide in the schedule.

  2. 2

    Insurance-backed is not risk-free

    Underwritten schemes vary. Insolvency cover, claim conditions, and maintenance duties differ. A certificate on the wall is not BRE Digest 245 proof.

  3. 3

    Match remedy grade to mechanism

    Buildopedia grades remedies established / conditional / caution. Guarantees do not upgrade a caution product into an established mechanism fix.

  4. 4

    Keep investigation records

    Photos, moisture profiles, and falsification notes matter more in a dispute than a logo. Joint Position Statement thinking still applies on traditional buildings.

  5. 5

    Warranties on new builds are another track

    NHBC-style new-home warranties differ from retrofit damp guarantees — see the new-build warranty guide. Do not mix the clocks.