Skip to content

Guide · UK & Ireland

Standard AST agreements: plain-English repair clauses & statutory limits

Cross-reference the five dominant UK Assured Shorthold Tenancy template families (Gov Model, NRLA, OpenRent, Propertymark/ARLA, DIY) against Landlord and Tenant Act 1985 s11, Fitness 2018 / s9A, HHSRS, and Consumer Rights Act 2015 s62 — so contractual repair wording is read against the statutory floor.

  1. 1

    Identify the template family before arguing the clause

    Most private lets used one of five packs: the UK Government Model Agreement (gov_model), NRLA standard (nrla_standard), OpenRent platform AST (openrent_standard), Propertymark/ARLA agent agreements (propertymark_arla), or generic Lawpack/stationer boilerplate (generic_diy). DIY packs carry the highest unfair-term risk. Machine index: /data/tenancy-templates.json. Interactive lookup: /tools/ast-clause-matcher. Encyclopaedia context: /tenancy.

  2. 2

    Apply the statutory floor — s11, fitness, CRA s62, HHSRS

    Landlord and Tenant Act 1985 s11 keeps structure/exterior (including drains, gutters, external pipes, windows) and water/gas/electricity/sanitation/heating installations on the landlord once on notice — these duties cannot usually be contracted out. Homes (Fitness for Human Habitation) Act 2018 / LTA 1985 s9A requires the dwelling to stay fit throughout, including serious damp and inadequate ventilation. Consumer Rights Act 2015 s62 makes unfair consumer terms non-binding — over-broad ‘tenant repairs everything’ lines fail here. HHSRS under the Housing Act 2004 is the council hazard lens. Detail: /tenancy/england-statutory-habitability-baseline.

  3. 3

    Inspection principle: structural and mechanical shifts to the tenant are void to that extent

    Contractual clauses attempting to transfer structural, exterior, or mechanical ventilation/heating-installation maintenance that statute places on the landlord to the tenant are void or unenforceable to that extent. Tenant-like care (clean, ventilate, heat sensibly, notify) remains real. ‘Tenant maintains the boiler’ or ‘tenant keeps the whole property in repair’ does not erase s11.

  4. 4

    Map clause themes to who must act

    Landlord structure & installations (Gov Model D3.1 style) — landlord repairs shell and core services after written notice. Tenant-like user (C4.1 style) — ordinary care and usable vents; not a transfer of roof, gutter, or boiler repair. Notice & report — dated written notice with photos. Inventory appliances — landlord keeps listed supplied appliances working unless misuse. Alterations — consent before structural/services works; emergency mitigation with immediate notice. Ventilation — tenant cleans accessible grilles; landlord repairs the fan unit under s11. Unfair shifts (DIY risk) — flag and override with statute.

  5. 5

    Use the matcher, then connect damp to building science

    Paste the clause into /tools/ast-clause-matcher for plain English, duties, statutory override, and an action step. If mould is the symptom, keep using extracts and trickle vents, photograph dead fans as installation repairs, and open /tenancy/damp-mould-without-blame plus /guides/loft-ventilation-upper-floor-damp and /guides/subfloor-airflow-ground-floor-damp. Ventilation-care wording is not a licence to ignore packed eaves or buried air bricks. England note: from 1 May 2026 private ASTs converted to assured periodic tenancies under the Renters’ Rights Act 2025 — households still hold AST-era PDFs; s11/fitness continue. This guide is general technical information, not advice on a particular contract.