UK & Ireland · Inside the building
Internal partitions
The wall inside the room: masonry, timber stud, or metal stud. They carry different loads and they do not share one damp mechanism. A masonry partition can bypass the damp-proof course. A stud partition cannot have rising damp.
All periods
How to recognise it
- Masonry sounds solid and is usually plastered brick or block, sometimes only 100 mm or a half-brick
- Timber stud sounds hollow, may be lath and plaster in older houses or plasterboard later, and will not hold a heavy fixing between studs
- Metal stud is the modern flat and office partition: hollow, with a deflection head at the slab above that is supposed to move
How it is built
- Masonry partitions on a solid ground floor need their own damp-proof course. Without it they draw moisture even when the external walls are sound
- Stud partitions are not a moisture path from the ground. Staining in them is a leak, condensation, or moisture from the wall they meet
- Fire resistance and sound insulation are the performance that matters in flats, and they live in the specification of the partition, not in a coat of paint
How it behaves
A tide mark on a partition in the middle of the ground floor is a classic bridged or missing damp-proof course in masonry. The same mark on a timber stud is not that, and injecting it is meaningless. Condensation still occurs on a cold external wall; a partition on an upper floor with mould is almost always air and temperature, or a leak from above.
What to watch
- Masonry partitions built off the slab with plaster continuous to the floor
- Stud walls carrying sanitary fittings they were not nogged for
- Removing a masonry partition that is actually holding something up. Internal does not always mean non-loadbearing
Mechanisms that belong here
- Surface condensation
Room air meeting a cold surface, dropping water, and often growing black mould. It is the most common damp mis-sold as rising damp.
- Penetrating damp
Rain getting through the envelope (the outside walls and roof): open joints, cracked render, failed trays, a bridged cavity, or a solid wall in driving rain that can no longer dry.
- Rising damp and a bridged damp-proof course
Ground moisture held in the base of a masonry wall. Genuine capillary rise (moisture climbing from the ground through the masonry) happens. It is diagnosed far more often than it is present. A bridged damp-proof course is the usual real version.
- Hygroscopic salts (salts that draw damp from the air)
Salts already in the plaster or masonry pull moisture out of humid air. The patch returns in muggy weather even when the leak or the ground water has stopped.
- A leak from a pipe, a roof, or a fitting
Liquid water from a failed pipe, a flat roof, a valley, a flashing, or an air-conditioner condensate. It is ordinary until it is called rising damp.