Replace salt-contaminated plaster
Ground salts and flue salts stay in the plaster after the water has stopped. They pull moisture from humid air and destroy decorations. After the wetting mechanism is named, contaminated plaster has to come off; on pre-1919 lime fabric prefer breathable lime / renovation plasters — dense cement ‘salt-holding’ systems are not the default first action on traditional walls.
It works when the diagnosis is right and the wall is the type the repair was made for. Misapplied, it wastes money or moves the water.
When it works
Sampling shows the masonry is at equilibrium, or a genuine rising-damp repair has been done, and the plaster is the thing still misbehaving. The new plaster is part of that system (lime-compatible on solid historic masonry), not a coating painted over the old one.
When it fails or causes harm
It is used instead of finding the water. New plaster on a wall that is still being rained on, or still condensating, fails. So does a waterproof plaster used to hide salts in a lime wall that needs to dry. Chemical DPC or damp-proof paint alone does not cure hygroscopic salts (salts that draw damp from the air).
Frequently asked
Does salt-contaminated plaster need replacement after the moisture source is stopped?
Usually yes where chlorides/nitrates remain in the plaster. Hygroscopic salts (salts that draw damp from the air) keep pulling vapour from humid air after free water has gone, so decorations fail and meters stay high (BRE Digest 245). BS 6576 systems pair a genuine rising-damp repair with removal of contaminated plaster and a salt-holding replacement specification — not a waterproof skim over the old band. Confirm masonry free moisture is controlled first; then strip the salt-laden plaster. New plaster on a wall still rained on or still condensating fails. Do not use dense tanking plaster to hide salts in a lime wall that must dry (BS 5250).