Skip to content

Guide · UK & Ireland

Moisture survey methods — meters, sampling, and imaging

What conductance meters, carbide/gravimetric sampling, and thermal imaging can and cannot prove — so agents and owners are not sold a diagnosis from a single beep.

  1. 1

    Start with construction and pattern

    Name the wall/floor/roof and map where marks sit versus rain, cold, and occupancy. Method choice follows the hypothesis.

  2. 2

    Conductance meters are screening tools

    They respond to salts and surface moisture. BRE Digest 245: a high reading is not, alone, rising damp. Use them to map, not to convict.

  3. 3

    When to sample

    Disputed rising damp or expensive injection proposals need drilled samples, oven drying, and hygroscopic versus free moisture separation where the standard of proof requires it.

  4. 4

    Thermal imaging pitfalls

    Cold spots show temperature, not water by default. Bridges, missing insulation, and evaporation all look ‘cold’. Combine with weather, meters, and opening-up.

  5. 5

    Write what would falsify the theory

    A competent survey states the leading cause, the evidence grade, and what observation would change the mind. That is the opposite of a product ticket.