Skip to content

Defect · moisture

Thermal bridging and cold spots

Local heat loss at junctions, lintels, slab edges, and fixings that cool the inner surface below dew point — mould without a ‘damp course’ story.

Mechanism

A cold bridge (also called a thermal bridge — a cold strip in the wall where mould often starts) is a path of higher conductivity through the insulated envelope (the outside walls and roof). Steel lintels, slab edges, balcony connectors, and poorly insulated reveals drop local surface temperature. Indoor vapour then condenses or elevates RH at that spot (BS 5250). The wall core can be dry while the paint grows mould.

Often confused with

  • Penetrating damp after rain on the same reveal
  • Rising damp at a cold external corner
  • Condensation inside the wall or roof layers (interstitial condensation) inside a cold roof build-up

What would support it

  • Mould or damp marking that tracks structural junctions more than rainfall
  • Thermal imaging or surface-temperature readings showing cold lines at lintels/slab edges
  • Pattern worse in cold weather with high indoor humidity

What would rule it out

  • Wet cores and salts after Digest 245 sampling at the same spot
  • Stains that only appear after wind-driven rain on that elevation

Common mistakes to avoid

  • Do not inject a DPC for corner mould that is a cold bridge
  • Do not seal the room airtight without cutting vapour at source
  • Do not rely on anti-mould paint as the sole repair

Frequently asked

How do I tell cold-bridge mould from rain penetration?

Cold-bridge mould follows temperature: external corners, lintel lines, slab edges, and metal fixings, worse in cold weather with indoor vapour — the BS 5250 condensation risk story. Rain penetration follows weather on that elevation and often wets the core (Approved Document C / BRE Digest thinking). Log weather vs occupancy; measure surface temperature against dew point (see /tools/dew-point); do not sell rising-damp products for a cold steel lintel.

Remedies

  • Surface condensation forms where room air meets a surface below the dew point. Steady low heat, and dealing with the cold bridge, removes the condition. Intermittent blasts of heat do not.

  • Take water vapour out of kitchens and bathrooms at source, and give the rest of the dwelling background and purge ventilation, as Approved Document F describes.

  • Whole-dwelling continuous extract or mechanical ventilation with heat recovery (MVHR) to control indoor vapour — works when designed, commissioned, and maintained; fails as a bolt-on afterthought.

  • Pre-1919 Georgian–Victorian solid walls of brick and stone were built to absorb some rain and dry. Lime lets them. Hard cement pointing, cement render, and waterproof coatings keep the water in and then the face of the wall fails.