Extract the moisture where it is made
Take water vapour out of kitchens and bathrooms at source, and give the rest of the dwelling background and purge ventilation, as Approved Document F describes.
The mechanism is well described, and this is the repair set out in a British Standard, an Approved Document, BRE guidance, or equivalent mainstream practice. It still has to match the building in front of you.
When it works
The staining or mould is surface condensation: cold corners, glass running with water, mould behind furniture, worse in cold weather, not tied to rain. It also works as half of the repair when a household produces a lot of moisture and the building has been sealed by new windows.
When it fails or causes harm
The wall is being wetted by rain, a leak, or ground moisture. A fan does not dry a saturated cavity or a rotten joist end. Ventilation rates should be taken from Approved Document F, not from a fan advert.
Frequently asked
When is improved extract ventilation the right first response to bedroom mould?
When the pattern is surface condensation: mould in cold corners, behind furniture, or on reveals; streaming glass; worse in cold weather; wall cores dry once surface moisture is allowed for (BS 5250). Bedroom mould after sealed replacement windows with weak or absent wet-room extract is the classic Approved Document F case — take vapour out at kitchens and bathrooms, restore trickle/background ventilation, then judge residual cold bridges. Extract first when rain, leaks, and ground salts are falsified. A fan does not dry a bridged DPC, a saturated cavity, or a rotten joist; do not sell extract as a cure for those mechanisms.
Mechanisms it is attached to
- Surface condensation
- Condensation inside the wall or roof layers (interstitial condensation)
- Spray foam insulation on pitched roof rafters (trapped moisture & rot)
- Tropical reverse condensation from indoor air conditioning
- Window and door installation defects
- Basement and cellar groundwater ingress
- Thermal bridging and cold spots
- Central heating and hot-water cylinder leaks
- Chimney stack decay and flue condensation
- Conservatory and orangery thermal-break failures