Window and door installation defects

Rain and draughts at openings caused by poor fixing, missing cavity closers/trays, failed sealants, and bridges at sills — not ‘the window product failed’ as a first story.

Mechanism

An opening is a hole in the weather envelope (the outside walls and roof). Water that enters at the head, jamb, or sill travels on cavity trays, membranes, and seals. Missing closers, inverted DPCs, unsealed frames, and bridged sills put water on the inner leaf or into the reveal. Replacement windows that omit trays and closers recreate the defect the old timber frame had learned to shed.

Often confused with

  • Condensation on cold glass (indoor vapour, not rain)
  • Rising damp on the wall below a wet sill
  • A roof abutment leak that only appears near an upper window

What would support it

  • Stains or blistering local to reveals after wind-driven rain
  • Open joints, missing sealant, or daylight at the frame
  • Cavity inspection or opening-up showing missing tray/closer or bridged sill

What would rule it out

  • Mould on cold glass and reveals that tracks humid weather, not rain
  • A continuous tide mark unrelated to openings

Common mistakes to avoid

  • Do not blame the sealed unit alone when the perimeter detail is open
  • Do not silicone over a missing cavity tray as if it were a tray
  • Do not foam-fill a cavity closer path without a designed thermal/fire closer where required

Frequently asked

Why does a new uPVC window still wet the reveal after rain?

Because installation, not the brand of frame, usually decides weathering. Missing or bridged cavity trays at the head, absent cavity closers, open sill details, and sealant as the only barrier put water onto the inner leaf. Treat head, jamb, and sill as three different details; instruct an invasive investigation of the cavity or remove a board before condemning the sealed unit. Condensation on glass is a different mechanism (BS 5250 / extract).

Remedies

  • Repoint open joints, repair cracked render, replace failed sills and copings, and put back cavity trays and weep holes so rain sheds off the outside instead of crossing the wall.

  • Cavity walls only work if the cavity is clear and trays shed water at openings, abutments, and changes in construction. Mortar droppings and debris bridge the cavity and take rain to the inner leaf.

  • A large share of damp sold as a wall problem is a rainwater fitting that does not carry water away. Repair the path before treating the wall.

  • Take water vapour out of kitchens and bathrooms at source, and give the rest of the dwelling background and purge ventilation, as Approved Document F describes.