Guide · UK & Ireland
New-build warranties and the defects period
How NHBC-style warranties, developer defects periods, and Building Regulations completion interact — and how to investigate snags without losing the mechanism.
- 1
Separate completion, defects period, and warranty
Practical completion / handover, a developer’s defects liability period, and a third-party warranty (e.g. NHBC) are different clocks. Read which covers what before assuming ‘the warranty will pay’.
- 2
Snagging is not diagnosis
A snag list catches unfinished work. Persistent damp, cracking, or cold mould still need construction and mechanism named. Meter readings alone are not a warranty claim narrative.
- 3
Common new-build moisture paths
Missing cavity trays at abutments, incomplete closers, cold bridges at junctions, and extract ducts that terminate in the loft appear early. Use the relevant defect records and guides.
- 4
Keep evidence dated
Photos, correspondence, and independent survey notes with dates matter more than informal chats with site managers who have moved on.
- 5
Building Regulations are not the warranty
A completion certificate shows a route to compliance was signed off. It is not a guarantee against every later defect. Latent defects may still need professional investigation.