Repair gutters, downpipes, flashings, and joints
A large share of damp sold as a wall problem is a rainwater fitting that does not carry water away. Repair the path before treating the wall.
The mechanism is well described, and this is the repair set out in a British Standard, an Approved Document, BRE guidance, or equivalent mainstream practice. It still has to match the building in front of you.
When it works
The mark lines up with a gutter, hopper, outlet, valley, chimney flashing, or a joint that faces the rain. It worsens in wet weather and eases in a dry spell.
When it fails or causes harm
The stain is mould on a cold corner in January, with sound gutters. Do not repoint a whole elevation because a downpipe was blocked, and do not stop at the downpipe if the wall behind it has already lost its pointing.
Frequently asked
Should rainwater goods be repaired before any internal damp treatment is specified?
Yes whenever the stain tracks a gutter, hopper, downpipe, valley, or flashing and worsens with rain. Liquid water from failed rainwater goods is ordinary envelope failure (Approved Document C / BS 5250 moisture paths); internal tanking, damp-proof paint, or chemical DPC before the path is stopped wastes money and traps residual moisture. Clear, repair, and prove the fitting runs in the next storm, then reassess the wall. Repoint or treat fabric only for damage the water already caused — do not specify whole-elevation products because one downpipe was blocked.
Mechanisms it is attached to
- Penetrating damp
- A leak from a pipe, a roof, or a fitting
- Flat roof ponding & cold-deck deck condensation
- Missing or defective cavity trays at pitched roof abutments
- Window and door installation defects
- EWI and thick-render moisture traps
- Podium deck and green-roof waterproofing failure
- Cavity wall insulation failure and bridging
- EIFS and rainscreen water intrusion (North America)
- Balcony waterproofing and threshold failures
- Chimney stack decay and flue condensation
- Parapet and abutment weathering failures
- Conservatory and orangery thermal-break failures