EWI and thick-render moisture traps

Rain and vapour trapped at failed EWI junctions, cracked render, buried DPCs, and sealed reveals after external insulation or thick modern render.

Mechanism

External insulation and render change how the wall sheds and dries. Cracks at corners, open beads, and failed seals at windows let rain behind the boards. A plinth that buries the DPC bridges ground moisture. Impervious finishes over still-wet masonry push moisture to openings and floors.

Often confused with

  • Ordinary penetrating damp on uninsulated masonry
  • Condensation only, with no rain correlation
  • Rising damp unrelated to the EWI plinth detail

What would support it

  • Defects concentrated at EWI joints, reveals, and base track after rain
  • DPC or air bricks obstructed by the insulation skirt
  • Opening-up shows wet boards or saturated render mesh plane

What would rule it out

  • Identical pattern on elevations without EWI
  • Only cold-weather mould with dry cores and intact weatherproofing

Common mistakes to avoid

  • Do not paint over cracked EWI as a waterproofing strategy
  • Do not bury the DPC with decorative insulation
  • Do not ignore manufacturer junction details at sills and eaves

Frequently asked

Why did damp appear after the house was wrapped in insulation?

Because EWI and thick render change rain shedding, drying, and DPC exposure. Cracked render, open beads, failed sill seals, and a plinth that buries the DPC put water behind the boards or bridge ground moisture — Approved Document C and BS 5250 territory, not a mystery new rising damp. Instruct an invasive investigation of junctions and the base track before quoting injection; Historic England solid-wall guidance still applies where the substrate (the wall behind) is historic masonry.

Remedies

  • Repoint open joints, repair cracked render, replace failed sills and copings, and put back cavity trays and weep holes so rain sheds off the outside instead of crossing the wall.

  • Lower high ground, cut back render and plaster that bridge the damp-proof course, and keep finished ground about 150 mm below it, which is the clearance Approved Document C describes.

  • Cavity walls only work if the cavity is clear and trays shed water at openings, abutments, and changes in construction. Mortar droppings and debris bridge the cavity and take rain to the inner leaf.

  • A large share of damp sold as a wall problem is a rainwater fitting that does not carry water away. Repair the path before treating the wall.