Guide · UK & Ireland
Condensation risk analysis — Glaser vs how heat and moisture move through the wall
When steady-state Glaser checks are enough, when BS EN 15026 dynamic simulation is warranted, and how both still sit under BS 5250 field judgement.
- 1
Start with construction and boundary conditions
Name the wall/roof build-up, indoor RH/temperature, and outdoor climate. Wrong layers make any calculation theatre.
- 2
Glaser (steady-state) role
Simplified vapour diffusion checks (BS EN ISO 13788 family) screen how heat and moisture move through the wall under steady assumptions. Useful for first-pass risk; weak for heavy rain, storage, and 2D junctions.
- 3
Dynamic heat-and-moisture modelling (BS EN 15026)
Numerical simulation handles transient moisture, liquid transport, and realistic climates. Use when retrofit, historic fabric, or disputed IWI/EWI risk needs stronger evidence.
- 4
BS 5250 still governs the narrative
UK condensation practice expects competent assessment and ventilation/heating context — models do not replace extract fans that do not work.
- 5
Report uncertainty
State material data sources, indoor moisture class, and what would falsify the conclusion. A single coloured graphic is not a guarantee.