Guide · UK & Ireland
PAS 2035 whole-dwelling retrofit process
How PAS 2035 structures risk assessment, retrofit coordination, and sequencing — so energy upgrades do not ignore moisture and ventilation.
- 1
Whole dwelling, not a single measure
PAS 2035 expects assessment of the house as a system: fabric, ventilation, heating, occupancy, and heritage constraints — not isolated grant measures.
- 2
Roles and competence
Retrofit assessor / coordinator pathways exist so someone owns risk and sequencing. DIY measure-stacking without that role recreates known failures.
- 3
Moisture and ventilation are in scope
BS 5250 condensation logic and extract performance sit inside responsible retrofit — not optional extras after the insulation invoice.
- 4
Traditional buildings need extra care
Historic England and Joint Position Statement thinking still apply on solid-wall stock. PAS 2035 does not licence impermeable finishes on wet lime walls.
- 5
Handover and monitoring
Occupant guidance and post-works checks catch blocked vents and misused MVHR filters before mould returns.