Defect · moisture
Cavity wall insulation failure and bridging
Bead, fibre, or foam cavity fills that bridge the cavity, hold water against the inner leaf, or were installed into dirty/ bridged cavities — rain and cold spots after ‘energy upgrade’.
Mechanism
A clear cavity drains and sheds wind-driven rain down the outer leaf. Fill that contacts both leaves, sits on mortar snots, or packs against trays and weep paths turns the cavity into a moisture bridge. Some foams and dense fills also change vapour behaviour. Failure presents as inner-leaf damp after rain, cold patches, and mould at corners — often blamed on ‘rising damp’ years after the fill.
Often confused with
- Rising damp on the ground floor only
- Failed pointing alone with an empty cavity
- Condensation from extract failure with no rain correlation
What would support it
- Damp pattern that tracks elevations and weather after cavity fill
- Borescope or opening-up showing fill contacting both leaves or sitting on debris
- Missing weeps, bridged trays, or fill above DPC / at openings
What would rule it out
- Empty clear cavity with rain path only at failed flashings
- Cold-weather mould with dry cores and no fill present
Common mistakes to avoid
- Do not inject a chemical DPC as the first response to post-fill damp
- Do not assume every fill must be extracted — evidence the bridge first
- Do not refill a dirty cavity without clearing debris and restoring trays/weeps
Frequently asked
Why did the walls get damp after cavity wall insulation?
Because fill can bridge a cavity that previously drained, especially where mortar snots, missing weeps, or trays were already wrong. Wind-driven rain then reaches the inner leaf (BS 8104 / Approved Document C thinking). Use a borescope or instruct an invasive investigation before quoting rising-damp injection; review-cavity-fill and tray clearance come before chemical DPC theatre (BRE Digest 245).
Remedies
- ConditionalReview retrofit cavity insulation
Fill in a suitable cavity, in a moderate exposure, with a sound outer leaf, can be uneventful. Fill in a narrow, dirty, or severely exposed cavity can connect rain to the inside. The remedy is a decision about that cavity, not loyalty to the guarantee.
- EstablishedClear the cavity and reinstate trays
Cavity walls only work if the cavity is clear and trays shed water at openings, abutments, and changes in construction. Mortar droppings and debris bridge the cavity and take rain to the inner leaf.
- EstablishedRepair the rain-shedding fabric
Repoint open joints, repair cracked render, replace failed sills and copings, and put back cavity trays and weep holes so rain sheds off the outside instead of crossing the wall.
A large share of damp sold as a wall problem is a rainwater fitting that does not carry water away. Repair the path before treating the wall.