Review retrofit cavity insulation

Fill in a suitable cavity, in a moderate exposure, with a sound outer leaf, can be uneventful. Fill in a narrow, dirty, or severely exposed cavity can connect rain to the inside. The remedy is a decision about that cavity, not loyalty to the guarantee.

It works when the diagnosis is right and the wall is the type the repair was made for. Misapplied, it wastes money or moves the water.

When it works

Damp started after filling, the elevation is exposed, and inspection shows saturated fill, missing trays, or open joints. Removing or replacing the fill is then a rational repair, together with the outside leaf.

When it fails or causes harm

A dry house in a sheltered terrace is ripped open because cavity fill is unfashionable. Also when the real change was new windows and no extract, and the fill is being blamed for condensation.

Frequently asked

Should existing cavity fill be reviewed or removed where it bridges a wet outer leaf?

Yes when damp began after fill, the elevation is exposed (BS 8104), and inspection shows saturated beads/fibre, missing trays, or open outer-leaf joints bridging rain to the inner leaf. Review is a decision about that cavity — not loyalty to a guarantee. Remove or replace failed fill together with fabric repairs (pointing, trays, weeps) under Approved Document C moisture paths; BS 5250 still applies if condensation is the competing mechanism. Do not strip a dry sheltered terrace because fill is unfashionable, and do not blame fill for bedroom mould after sealed windows with no extract.