PIR vs woodfibre insulation — mechanism, not a shopping list

How rigid PIR/phenolic boards and woodfibre (or other vapour-open) insulations change heat, vapour, and fire behaviour — so retrofit choices follow the wall, not the brochure.

  1. 1

    Name how the wall is built first

    Solid lime masonry, insulated cavity, timber frame, and warm roofs each tolerate different vapour resistances. Product choice follows the wall type and rain risk (BS 5250; Historic England on traditional fabric).

  2. 2

    PIR and foil-faced boards

    High thermal resistance per thickness, often with low vapour permeance. Useful where a designed vapour control layer belongs; risky as a cold-side ‘sticker’ on damp solid walls that still need to dry.

  3. 3

    Woodfibre and vapour-open systems

    Generally more vapour-open and hygroscopic. Often preferred in breathability-led retrofit of traditional solid walls when rain exclusion is sound — still not a cure for rising ground bridging.

  4. 4

    Fire and junctions

    Reaction-to-fire and cavity barrier rules still apply (Approved Document B). Continuous insulation details at reveals decide thermal bridges (Approved Document L) as much as lambda values.

  5. 5

    Refuse brand wars without heat-and-moisture logic

    Neither product family is universally ‘eco’ or ‘best’. rain first, then vapour strategy, then thickness — link to IWI and EWI records on this site.