Uncover the damp-proof course
Lower high ground, cut back render and plaster that bridge the damp-proof course, and keep finished ground about 150 mm below it, which is the clearance Approved Document C describes.
The mechanism is well described, and this is the repair set out in a British Standard, an Approved Document, BRE guidance, or equivalent mainstream practice. It still has to match the building in front of you.
When it works
There is a physical damp-proof course and something has buried it: a patio, a flower bed, a path, external render, or internal plaster taken down to the floor. Digest 245 treats bridging as far more common than failure of the course itself.
When it fails or causes harm
There is no course and sampling has shown a true capillary rise (moisture climbing from the ground through the masonry). Lowering the ground still helps, but it may not be the whole repair. It does nothing for mould at ceiling level.
Frequently asked
How far below the DPC should external ground, paths, and planters finish to unbridge the course?
About 150 mm from finished ground to the damp-proof course line is the clearance Approved Document C describes for ordinary external ground. Paths, patios, planters, and render skirts that bury or sit within splash height of the DPC bridge an otherwise sound course — BRE Digest 245 treats bridging as far more common than DPC failure. Measure and lower ground, cut planters back, and chase bridging plaster/render off the course before any injection. Internal screeds or plaster taken across the DPC need the same break. Clearance alone does not cure condensation at ceiling level.