Skip to content
Established

Steady heat and fewer cold surfaces

Surface condensation forms where room air meets a surface below the dew point. Steady low heat, and dealing with the cold bridge, removes the condition. Intermittent blasts of heat do not.

The mechanism is well described, and this is the repair set out in a British Standard, an Approved Document, BRE guidance, or equivalent mainstream practice. It still has to match the building in front of you.

When it works

Mould and water are on the coldest surfaces: external corners, lintels, uninsulated reveals, north walls, single glazing. The fabric itself is not wet in its depth.

When it fails or causes harm

Someone insulates internally, or seals a solid wall, without a moisture-risk assessment. A warmer room in front of a colder, wetter wall can move the problem into the fabric. See condensation inside the wall or roof layers (interstitial condensation).

Frequently asked

Does background heat and dealing with cold bridges beat intermittent heating blasts for condensation?

Yes. Condensation forms where room air meets a surface below dew point. Steady low background heat keeps fabric and corners above that temperature; short hot blasts warm air briefly while walls and lintels stay cold, so water returns as soon as the blast ends. Address thermal bridges (uninsulated reveals, concrete lintels, north corners) under BS 5250 moisture risk and Approved Document L detailing — without trapping moisture in solid walls via impermeable internal insulation. Continuous modest heat + warmer surfaces + extract beats weekend heating spikes and damp-proof paint on mouldy corners.

Mechanisms it is attached to