Continuous mechanical ventilation and MVHR
Whole-dwelling continuous extract or mechanical ventilation with heat recovery (MVHR) to control indoor vapour — works when designed, commissioned, and maintained; fails as a bolt-on afterthought.
It works when the diagnosis is right and the wall is the type the repair was made for. Misapplied, it wastes money or moves the water.
When it works
Airtight or poorly ventilated dwellings with persistent surface condensation/mould after extract fans and heating are already adequate, and a competent design addresses intake, extract, filtration, and noise (Approved Document F / BS 5250 context).
When it fails or causes harm
Units are undersized, uncommissioned, filters clogged, summer bypass ignored, or used as a substitute for repairing rain ingress and rising damp. MVHR does not dry a bridged DPC.
Frequently asked
Is MVHR a cure for rising damp?
No. Continuous ventilation and MVHR manage indoor vapour under Approved Document F and can cut condensation risk when the fabric is weathertight and the system is commissioned (BS 5250 context). Capillary rise (moisture climbing from the ground through the masonry) and rain penetration need fabric and drainage repairs first. Name the mechanism — vapour vs liquid water — before specifying MVHR as the primary damp remedy.