Skip to content

Guide · UK & Ireland

Investigate a damp wall before anyone treats it

The order a careful survey uses. Name the construction, separate the patterns, and only then look at a remedy. A moisture meter is not step one.

  1. 1

    Ask what changed

    New windows, cavity fill, a cement render, blocked air bricks, a raised patio, a bathroom above, clothes dried indoors, a tree, a very cold winter, a washed-out drain. Damp that started after a specific change is telling you the change. Damp that has always been there, in the same band, is telling you the original construction.

  2. 2

    Name the construction before the product

    Solid brick, stone, an early cavity, an insulated cavity, timber frame, a concrete block leaf. The mechanisms that are even possible depend on it. Brick slips do not get rising damp. A timber stud partition does not get a chemical damp-proof course. A cavity with horizontal cracks is a tie question, not a tanking question.

  3. 3

    Map the pattern on paper

    Where, how high, which elevation, whether it follows rain, cold weather, or humid weather, whether it sits on a chimney, a gutter line, or a pipe. Photograph with a scale. One house often has two mechanisms. Condensation upstairs does not disprove a bridged damp-proof course in the kitchen, and it does not prove one either.

  4. 4

    Read the outside before the inside

    Ground levels against the damp-proof course — Approved Document C's usual clearance is about 150 mm from finished ground. Gutters that actually run, open joints, cracked render, sills, trays over openings, air bricks that still connect to a void. A hose test can be useful and can also be misleading. It is not a substitute for the way the wall behaves in real weather.

  5. 5

    Distrust the meter

    Conductance meters respond to salts. Digest 245 says a high reading is not, on its own, rising damp. Where the cause is disputed and money is about to be spent, the established check is drilled samples, weighed and oven-dried, with hygroscopic moisture separated from free water. Surface condensation does not leave the core of the wall wet. Rising damp leaves a gradient, wetter lower down, with chlorides and nitrates.

  6. 6

    Name the cause, then open the remedy

    If two causes still fit, the next spend is the observation that separates them, not a treatment 'to be safe'. Injection into a wall that is condensating, or tanking a lime wall that needs to dry, is how a modest problem becomes a long one. Write down the construction, the observations, the cause you consider most likely, what would falsify it, and the evidence grade of the repair.

  7. 7

    Upper floors: open the loft before you sell a wall treatment

    Damp or mould in bedrooms under a cold pitched roof is often blocked eaves ventilation, extract dumping into the loft, or a delayed underlay puncture — not a new rainstorm and not rising damp. Inspect soffits from outside, then the eaves path and ducts from inside. Use the dedicated loft guide and free triage checklist before anyone quotes for injection or tanking upstairs.

  8. 8

    Ground floors: ask whether underfloor airflow was built in — and blocked

    On suspended timber floors, opposite air bricks dry the void. A new drive, patio, conservatory, or solid extension that buries those vents creates low damp mis-sold as rising damp. First contact everywhere: should there be airflow here, how was it designed in, and has it been impeded? Use the subfloor airflow guide and free triage before chemical DPC quotes.