Chemical damp-proof course

A chemical barrier injected to replace a missing damp-proof course. BS 6576 describes how to diagnose first and how to install one. It is a conditional repair, not a product to buy because a meter beeped.

It works when the diagnosis is right and the wall is the type the repair was made for. Misapplied, it wastes money or moves the water.

When it works

Rising damp has been shown by a moisture gradient and by ground salts, the wall can hold a continuous barrier, bridging has been removed, and salt-contaminated plaster is replaced. A physical course that already exists should be uncovered before anyone injects a second one.

When it fails or causes harm

The damp is condensation, rain, a leak, or hygroscopic salts (salts that draw damp from the air) left behind after the water has gone. Rubble-cored and very thick stone walls often will not form a continuous chemical barrier. Injection without replastering leaves the salts, so the stain comes back and the injection is blamed.

Frequently asked

When is a chemical DPC appropriate — and when is it a misapplied product sale?

Appropriate only after rising damp is evidenced to BS 6576 / BRE Digest 245: free-moisture gradient in the wall body, ground salts, masonry path from wet ground, and all bridging removed. The wall must be able to hold a continuous barrier; salt-contaminated plaster is replaced as part of the system. Misapplied when sold from a conductance-meter beep against condensation, rain penetration, chimney hygroscopic salts (salts that draw damp from the air), leaks, or a still-bridged physical course. Uncover an existing physical DPC before injecting a second one; refuse quotes that skip sampling and bridging clearance. Rubble-cored thick stone often will not form a reliable chemical barrier.