Repair corroding reinforcement
Spalling concrete with rust stains is steel expanding as it corrodes, usually because cover was thin or carbonation and chlorides have reached the bar. The repair cuts back to sound steel, cleans it, and reinstates cover in a system meant for the exposure.
The mechanism is well described, and this is the repair set out in a British Standard, an Approved Document, BRE guidance, or equivalent mainstream practice. It still has to match the building in front of you.
When it works
An engineer has seen the extent: carbonation, chlorides near the sea, and whether the bar has lost section. BS EN 1504 describes repair products. In Thailand the same physics applies; the person who specifies it should be licensed for that structure.
When it fails or causes harm
Rust is painted and skimmed. The bar keeps corroding and the patch blows off. It also fails when a crack along an infill joint, with no rust and no exposed steel, is treated as concrete cancer.